Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> 4 <br /> 1.13 Contract Time -The number of calendar days stated in, or computed from, the Contract <br /> Documents for the completion of the Work, or any portion thereof. See, particularly, Article 13 <br /> hereof and the Contract Construction Schedule. Time of completion as specified therein is of the <br /> essence. The time used and referred to on the Project will be that time which is observed in <br /> Raleigh, North Carolina, being Eastern Daylight Savings Time (EDT), Eastern Standard Time <br /> (EST), or other as designated by the Designer. <br /> 1.14 Contractor-The Contractor shall be that party identified as such in the Contract <br /> Documents. <br /> 1.15 Days - Unless otherwise indicated, the term "days" shall mean consecutive calendar days. <br /> 1.16 Daylight Hours -The hours or portions of hours between sunrise and sunset local time. <br /> 1.17 Designer(s) —The person or firm designated as the Designer in the Contract Documents, <br /> or their authorized representatives. The Designer(s), as referred to herein, shall mean architect, <br /> landscape architect, and/or engineer. They will be referred to hereinafter as if each were of the <br /> singular number and masculine gender. On projects for which there is no Designer designated <br /> references to approvals or authorizations of or by the Designer shall be interpreted to refer to <br /> approvals or authorizations of Owner or Owner's designee. <br /> 1.18 Drawings -The Drawings are the graphic and pictorial portions of the Contract Documents, <br /> wherever located and whenever issued, showing the design, location, and dimensions of the <br /> Work, and generally including plans, elevations, sections, details, schedules and diagrams. A <br /> list of the Drawings is contained in the Contract Documents. <br /> 1.19 Field Order-A written order issued by the Designer which clarifies or interprets the <br /> Contract Documents or orders minor changes in the Work in accordance with the Contract <br /> Documents. See paragraph 14.2. <br /> 1.20 Final Completion -The point at which the Contractor has completed the Work, with the <br /> exception of guaranty and warranty obligations and as determined by the Designer and <br /> becomes entitled to final payment upon the recommendation of the Designer and determination <br /> by the Owner. <br /> 1.21 The words "furnish," "furnish and install," "install," and "provide" or words with similar <br /> meanings shall be interpreted, unless otherwise stated, to mean furnish and install complete, in <br /> place and ready for service. <br /> 1.22 Liquidated Damages —See paragraph 13.18 of these General Conditions. <br /> 1.23 Modification - (A) a written amendment to the Contract Documents signed by the Owner <br /> and the Contractor and identified therein as such, (B) a Change Order, (C) Construction <br /> Change Directive, or(D) a Field Order. A Modification may only be issued after execution of the <br /> Agreement. <br /> 1.24 Notice of Award -The written notice by the Owner to the Contractor that the Contractor is <br /> the successful Bidder and that upon compliance with the conditions precedent to be fulfilled by <br /> Revised 7114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.