Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> ADDENDUM NO.3(ELECTRICAL) <br /> DATE: February 12,2015 0% 1111111111 <br /> 1111111111 , <br /> CAS• , <br /> PROJECT: Orange County Community Center <br /> Cedar Grove = 9� <br /> SEAL <br /> ARCHITECT: Ms. Angie Crawford = 039843 <br /> Boomerang Design ,r*'••.AGiNE��`.•'••!3:-.`,` <br /> ENGINEER: 2900rRowland <br /> Design RoadCSlu to 1 Ove, Ltd. 100 0'ic, <br /> Raleigh, North Carolina 27615 <br /> PDC PROJECT#13057 <br /> The following items or modifications to the original Plans and Specifications shall be included as part of the <br /> contract work. All General Conditions, Supplemental General Conditions, and Special Conditions are as <br /> originally specified. <br /> Respective Bidders shall include the provisions of this Addendum in their proposal and shall make a notation <br /> in the proposal that these provisions have been included. <br /> Changes to Electrical Drawings: <br /> Drawing E201 (Sketch AD-ES-01) <br /> • Revised lighting layout in Room 122. <br /> Drawing E005(Sketch AD-E3-02) <br /> • Clarified wire size and MTS identification <br /> END OF ADDENDUM NO. 3(ELECTRICAL) <br /> Attachments: Electrical Sketches(2) <br /> Addendum No.3(Electrical) Page 1 of 1 February 12,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.