Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> Ae <br /> RECREATION AW8 <br /> ROOM IW.51A <br /> A502 123 <br /> 4 27'-6" 5'-4" <br /> IW.51A 111V,51 <br /> 2'X 6'WALL PADS(20'L.) v CLEAN DISCOLORED BRICK <br /> w &MORTAR WHERE CANOPY <br /> I' IS CUT BACK; REPOINT <br /> BRICK AS REQ'D <br /> I <br /> DOOR OPENING I Q <br /> J&BRICK TO <br /> i EXISTING 109 10'-8"X 4'ALUM. CANOPY <br /> ABOVE DOOR(COORD.W/ <br /> - - - J EXIST. CANOPY WIDTH), <br /> SEE 5/A301 FOR DTL. <br /> PATCH/REPOINT BRICK <br /> WALL TO REMAIN AS REQ'D <br /> 8 <br /> A502 T --- <br /> MUL - ROOM PATCH/REPOINT BRICK WALL <br /> - 'TO REMAIN AS REQ'D <br /> !REPAIR BRICK WHERE CONC. <br /> —�--- COAL BIN CAP IS REMOVED <br /> i <br /> cV <br /> ti c:) W <br /> Q <br /> i <br /> i <br /> A502 <br /> i <br /> f ", CEDAR GROVE COMMUNITY CENTER <br /> IdBAt Archlf.f—,PA 's P .° PROJECTTITLE: <br /> boomeran 5 <br /> D E S I G N >"s BOOMERANG DESIGN PROJECT NO.: <br /> rethink,repuipose results <br /> 02.11.15 ADD. #3 ABD-0 1/A102 <br /> 6131 Falls of Neuse Rd.I Suits 204 1 Raleigh,NC 27609 DRAWING RELEASE DATE: ISSUE NO.: BULLETIN NO.: DRAWING REFERENCE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.