Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> 10. The District Office must be consulted if there are any changes in the plans as they were <br /> submitted. <br /> 11. Any damage to roadway, structures, or associated appurtenances shall be restored to its <br /> original condition as directed by the District Engineer. <br /> 12. Excavation material shall not be placed on the pavement, Drainage structures shall not be <br /> blocked with excavation material. <br /> 13. The applicant shall comply with all applicable federal, state and local environmental <br /> regulations, and shall obtain all necessary federal, state and local environmental permits, <br /> including but not limited to,those related to sediment control, storm water,wetland, streams, <br /> endangered species,and historical sites, <br /> 14. All excavation in the roadway shall be backfilled and paved or covered with temporary steel <br /> plating. When steel plating is used the excavation shall be backfilled and/or shored to <br /> accommodate anticipated traffic loads. A reflectorized bump warning sign (WB-1) must be <br /> installed in advance of the plate. All steel plating shall be pinned in at each corner with a <br /> smooth headed pin that does not protrude above the plate more than 0.5 inches and must <br /> extend into the paved surface at least 3 inches.The plate must be extended at least 12 inches <br /> beyond the edge of the excavation in all directions and ramped with asphalt at least 6 inches <br /> wide. <br /> i <br /> 15. Trenching, bore pits, and other excavations within the safe recovery area shall not be left <br /> I open or unprotected so as to expose motor vehicle or pedestrian"traffic to unsafe conditions. <br /> The contractor shall comply with all OSHA requirements and provide a competent person on <br /> 1 site to supervise excavations at all times. <br /> 16. Before planting any landscape within the right of way,the encroaching party shall submit an <br /> application for a planting permit to this office. The permit must be approved prior to the <br /> installation of any plans. <br /> 17. All disturbed areas shall be repaired with the following rate of seed; fertilizer and limestone <br /> in pounds per acre,and the areas properly mulched and tacked: <br /> 25#Reliant Hard Fescue <br /> 100#Alta or Kentucky 31 Tall Fescue <br /> 25#Kenblue Kentucky Bluegrass <br /> 1000#5-10-10 Fertilizer <br /> 4000#Limestone <br /> 18. For your general information: <br /> • The$50.00 inspection fee for this driveway connection was paid by check. <br /> (Check# 13 042) <br /> P.O.Box 766 Graham,NC 27253 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.