Browse
Search
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-173-E AMS - Racanelli Construction South, Inc. for Cedar Grove Community Center Construction $2,311,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 3:43:25 PM
Creation date
4/9/2015 1:42:23 PM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Chair signed
Document Relationships
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
R 2015-173-E AMS - Racanelli Construction South, Inc. for CGCC Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> DRIVEWAY PERMIT SPECIAL PROVISIONS <br /> 1. A copy of the permit and the approved plans stamped by NCDOT will be on the site and <br /> available for inspection by NCDOT personnel while in construction is on kogress. If safety <br /> or traffic conditions warrant such an action,NCDOT reserves the right to stop all work unless <br /> evidence of approval can be shown. <br /> 2. It will be necessary for you or your contractor to notify Mr. DeAngelo Jones,Assistant <br /> District Engineer, upon receipt of this letter to schedule a mandatory Preconstruction <br /> Conference,to provide your anticipated date of starting or to review any plan revisions <br /> made by the District Office prior to construction beginning on this permit. Mr. Jones <br /> can be reached at(336)570-6833 between the hours of 8:00 a.m. and 5:00 p.m.Monday <br /> through Friday. <br /> 3. When working within NCDOT right of way,District Personnel, Shawn Smith,shall be <br /> notified twenty- four (24) hours in advance at telephone number (336) 570-6833 for <br /> inspection at each of the following phases: (A)Drainage, (B) Grading,(C)Placement of <br /> base,(D)Paving,(E)Seeding. <br /> i <br /> 4. When the work has been completed, please notify Mr. Jones by letter at P.O. Box 766, <br /> Graham,North Carolina 27253-0766 in order that a final inspection can be made. <br /> i <br /> 5. WORK ZONE TRAFFIC CONTROL QUALIFICATIONS AND TRAINING <br /> PROGRAM- Effective July 1, 2010, all flagging operations within NCDOT Right of Way <br /> required qualified and trained Work Zone Flaggers. Effective July 1, 2011, qualified and <br /> trained Work Zone Traffic Control Supervisors will be required on Significant Projects. <br /> Training for this certification will be provided by NCDOT approved training sources and/or <br /> private entities that have been pre-approved to train themselves. If you have questions, visit <br /> our web site at www.nedot.org/doh/Preconstruction/wzte/wztctrainin ro am/def tutt,htntl or <br /> contact Stuart Bourne,P.E.with NCDOT Work Zone Traffic Control Unit at(919)250-4159 <br /> or sboume ,ncdot.gov. <br /> 6. That the of the second art agrees to provide traffic control devices, lane closures,road <br /> P�3' p �' P <br /> ( closures, positive protection and/or any other warning or positive protection devices <br /> necessary for the safety of road users during construction and any subsequent maintenance. <br /> This shall be performed in conformance with the latest NCDOT Roadway Standard Drawings <br /> and Standard Specifications for Road and Structures and Amendments or Supplements <br /> thereto. When there is no guidance provided in Roadway Standard Drawings or <br /> Specifications, comply with the Manual on Uniform Traffic Control Devices for Streets and <br /> Hiahways and Amendment or Supplement thereto. Information as to the above rules and <br /> regulations may be obtained from the Division Engineer of the party of the first part. <br /> 7. Work requiring lane closure or restrictions will not be allowed between 7:00 am—9:00 <br /> am and 4:00 p.m. —7:00 p.m.Monday through Friday unless otherwise directed by the <br /> District Engineer or as shown on the approved plans. <br /> 8. At least one lane of traffic shall remain open at all times. <br /> 9. Any work requiring equipment or personnel within 5' of the edge of any travel lane shall <br /> require a lane closure with appropriate tapers. <br /> P.O.Box 766 Graham,NC 27253 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.