Orange County NC Website
DocuSign Envelope ID:29F350EB-C553-4EEB-BD97-898B3775EE03 <br /> [Departmental Use Only] <br /> TITLE Cedar Grove Community Ctr <br /> FY FY2014-15 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 17th day of <br /> March, 2015, by and between Racanelli Construction South, Inc., (hereinafter called the "Contractor"), and <br /> Orange County,a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "County," "Orange County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by MBAJ Architecture, PA, including the base bid condition, <br /> Alternate 1, Alternate 2, Alternate 3, and Alternate 4. All references within the documents to <br /> the name Boomerang Design refer to MBAJ Architecture, PA (Sheet sets (totaling 60 sheetes): <br /> G101-103; Survey Sheet; C0.0-C6.5; A041-A604; I801, 5101-S102; P001-P201; M001-M403; <br /> E001-E601 dated November 11, 2014, along with Addendum #1 dated January 29, 2015 <br /> Addendum#2 dated February 6,2015, and Addendum#3 dated February 12,2015.) <br /> Revised 10/14 1 <br />