Browse
Search
S 2015-171-E AMS - Stealth Power LLC - Memorandum of Understanding - Ambulance Idle Reduction $0
OrangeCountyNC
>
BOCC Archives
>
Memorandum of Understanding
>
2010-2019
>
2015
>
S 2015-171-E AMS - Stealth Power LLC - Memorandum of Understanding - Ambulance Idle Reduction $0
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 8:25:19 AM
Creation date
4/8/2015 8:25:13 AM
Metadata
Fields
Template:
BOCC
Date
4/8/2015
Meeting Type
Work Session
Document Type
MOU
Agenda Item
Manager signed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: C5AE60ED-3944-4BD4-888D-03C35A9C4941 <br />Memorandumof <br />Understanding <br />Between <br />OrangeCountyGovernment <br />8181 <br />POBox <br />131W.MargaretLane,Suite300 <br />Hillsborough,NC27278 <br />and <br />StealthPower-LLC <br />3300BeeCavesRd. <br />Austin,TX78746 <br />ThisMemorandumofUnderstanding(MOU)setsforthetermsandunderstandingbetweenthe <br />OrangeCountyN.C.(OCNC.)andtheStealthPowerLLC(SP)toNCCleanEnergyTechnology <br />CenterSponsoredProject,"StealthPowerMobilePowerIdleReductionTechnologyOrange <br />CountyEMSFleet,"undertheNCCleanEnergyTechnologyCenter's/NCDepartmentof <br />Transportation,CleanFuelAdvancedTechnology(CFAT)2013-20ISProgram. <br />(CFATPROJECT). <br />Background:SP,withcommitmentletterfromOCNChasproposedandbeenawardedfunding <br />undertheCFATPROJECT.ToallowdisbursementofawardedfundingincludingSPidle <br />reductiontechnologyvaluedat$181,965.00tobeinstalledandretainedbyOCNCpostproject <br />onuptosevenOCNCEMSvehicles,theCFATPROJECTrequiresfleetparticipantstosigna <br />MOUagreeingtoprovidein-kindcostsharetotheprojectintheformofprojectmanagement, <br />fleetstafflabor,fuelcosts,reportingandoutreach.Costsharewillincludemanagementof <br />OCNCsupporttomeetingsandreviewofdataandwrittenreports,aswellasfleetdriverlabor <br />andfuelforoperatingparticipatingambulancesoverthe6monthdurationoftheCFAT <br />PROJECTaswellastherequired3yearstotalreportingforNCCETCreportingand <br />participationinoutreachactivities. <br />Purpose:ThisMOUwilldocumentOCNCcommitmenttosupporttheCFATProject <br />requirementsassctforthintheSPawardedCFATPROJECTIdleReductionproposaland <br />includeOCNCin-kindcost-sharestafflaborandfleetvehicleavailabilityforinstallation, <br />operationaldatacollection,monitoring,andoutreachtosupporttheeffortstodemonstratethe <br />StealthPowerMobilePower(SPMP)APUsysteminfirstrespondervehicles. <br />SpecificallyOCNCshallprovide: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.