Browse
Search
2015-170-E AMS - 5th Wall Building Diagnostics Consultants for roof replacement design and consulting services $5,500
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-170-E AMS - 5th Wall Building Diagnostics Consultants for roof replacement design and consulting services $5,500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2016 4:14:48 PM
Creation date
4/8/2015 8:20:21 AM
Metadata
Fields
Template:
BOCC
Date
4/8/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-170-E AMS - 5th Wall Building Diagnostics Consultants - roof replacement design and consulting services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F4B3E08B-D87A-4AE0-BD19-D169D4E8F41B <br /> Jefl'Thornp,A)n <br /> Roof rephicenient design and consulting smices <br /> Asset Managentent Services <br /> North Operations Warehouse <br /> North Operations Small Storage <br /> Hillsborough,NC <br /> 5t)Mall Proposal No, 14-12-23 <br /> December 14,2014 <br /> Page 2 <br /> Wind uplift <br /> Fire resistance of the roof assembly <br /> Current codes and standards <br /> Drainage requirements <br /> Roof system type <br /> NOTE. At this time we anticipate that a fluid-applied mernbrane will be utilized. <br /> Warranty <br /> Sheet metal flashings <br /> Perimeter and penctration terminations <br /> • Preparing art opinion of estimated construction cost <br /> • Preparing an opinion of estimated project schedule <br /> B. Bidding <br /> 1. Attending Pre-Bid Conference <br /> 2, Preparing and distributing Minutes of the Pre-Bid Conference <br /> 3. Preparing any required addenda to the plans and specifications <br /> 4. Addressing Contractor and Owner questions during the bid period <br /> 5. Assisting in review of bids and making appropriate recommendations <br /> C. Contract Administration <br /> I, Preparing the contract between Owncr and Contractor <br /> I Reviewing Contractor submittals <br /> 3. Attending Pre-Construction Conference <br /> 4. Preparing and distributing Minutes of the Pre-Construction Conference <br /> 5. Attending periodic progress meetings <br /> 6 Addressing Contractor and Owner questions during construction <br /> 7. Review Contractor Pay Requests <br /> D. Construction Quality Assurance <br /> 1. Performing periodic site visits during construction to assure that work is being performed <br /> in accordance with the plans and specifications. <br /> During Our site visits we will meet with your personnel, attend scheduled meetings,check <br /> materials, observe construction in progress, examine completed work, and discuss future <br /> Work, A report summarizing our observations will be provided to Orange County. <br /> Based on our understanding of the current scope of work, we anticipate the duration of <br /> construction to be as follows: <br /> North Operations Warehouse:— 10 consecutive calendar days <br /> North Operations Small Storage - 7 consecutive calendar days <br /> 9601 BaHeywick Rd- Raleigh, NC 27615 www.5thwallbdc.com <br /> 9191616-4715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.