Browse
Search
Minutes 02-11-2014
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2014
>
Minutes 02-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2015 10:50:57 AM
Creation date
4/8/2015 8:10:35 AM
Metadata
Fields
Template:
BOCC
Date
2/11/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 02-11-2014 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 5
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Commissioner McKee said there had also been discussion about co-locating for better <br />internet connectivity. <br /> Jim Groves said it may not be worth the money to add the towers. <br /> Jim Groves reviewed the costs for renting a tower, and he said another option would be <br />for the County to build a tower and rent it. <br /> Commissioner Rich asked how much it costs to build a tower. <br /> Jim Groves said it depends on the type of tower, but the amount would be between <br />$350,000 and $750,000. He said the VIPER equipment would put it close to $1 million. <br /> Commissioner McKee there had been a mention of looking into the 700 mhz service. <br /> Jim Groves said there have been some good conversations with Durham and other <br />partners about this, and the concern was to make sure there would be good interoperability. He <br />said there has been agreement to allow this. He said the FCC has to provide frequencies for <br />these tower sites. He said there are about 40 different frequencies, and it would be possible to <br />build a simulcast system. He said this means that all of the towers could transmit at the same <br />time, which would help improve coverage. He said only 20 of the 40 frequencies would be <br />needed to make this work, which would mean 15 frequencies could potentially be dedicated to <br />emergency services. He said 5 could be designated for non-public safety uses, such as <br />schools and public transit, and these could be borrowed by emergency services if a need arises. <br />He said, in theory, it seems like this would be a good system, and the County has a decision to <br />make about what direction to go. He said this system could be built for about one-third of the <br />cost. <br /> Chair Jacobs asked if staff will come back with a recommended proposal. <br /> Jim Groves said he will be happy to put this together. <br /> Chair Jacobs said it sounds like that the 700 mhz system would be preferred by most of <br />the people working in emergency services. He said it would be nice to know what this would <br />cost and to see it flushed out for further consideration. <br /> Jim Groves said this current study is just to show how coverage can be improved, but it <br />has nothing to do with building a County system or a simulcast system. He said the point is that <br />there is an existing coverage problem, and this plan will need to be implemented in some shape <br />or form to improve that. <br /> Commissioner Price asked about the timeline. <br /> Chair Jacobs said this was supposed to come back in March for the 800 mhz. He said it <br />would be up to staff to determine the timing. <br /> Jim Groves said it would take a couple of months for him to put a decent proposal <br />together. <br /> Commissioner Pelissier referred to a previous discussion of the First Net system. She <br />asked how this will fit in. <br /> Jim Groves said N.C. probably will not see this until 2016-17, and he said First Net is <br />just a public safety broadband that is built in partnership with private communities. He said this <br />is a little more of a robust system, but there will be a subscriber fee to use it. He said it will give <br />private companies incentive to build a tower. He said the VIPER system is a good play on <br />getting ahead of this curve by helping provide more control of the system. <br /> Commissioner Gordon asked for an explanation of what will come back in March. <br /> Jim Groves said the current CIP has staggered amounts of half a million dollars each. <br />He said any changes, such as building our own towers, would require modification. <br /> Commissioner Gordon asked if the future proposal that will be flushed out will mean <br />additions to the CIP. <br /> Jim Groves said yes. <br /> Commissioner Gordon asked if this is the only item that will be brought back. <br /> Jim Groves said the proposal will provide two different options, along with the associated <br />costs and timing, and it will be the Board’s decision. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.