Browse
Search
Minutes 02-11-2014
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2014
>
Minutes 02-11-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2015 10:50:57 AM
Creation date
4/8/2015 8:10:35 AM
Metadata
Fields
Template:
BOCC
Date
2/11/2014
Meeting Type
Work Session
Document Type
Minutes
Document Relationships
Agenda - 02-11-2014 - Agenda
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 1
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 2
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 3
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 4
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
Agenda - 02-11-2014 - 5
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2014\Agenda - 02-11-2014 - Budget Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Recap <br />Five (5) tower sites recommended for VIPER coverage <br />4 existing towers <br />1 new tower <br />Two (2) tower sites recommended for VHF paging coverage <br />One (1) new tower site <br />One (1) existing tower site <br /> <br />Cost Example <br />Co-location cost example (GTE Wireless) <br />$1,000 credit application fee <br />$2,000 structural analysis <br />$2,000 inspection fee (if construction installation fee is waived) <br />$1,500 Closeout documentation fee <br />Total set up - $6,500 one time cost <br />$2,500 rental fee, per month with 5 year term <br />Four (4) automatic renewal 5 year terms at 3% escalation <br />Total rent $30,000 / yr. per tower site <br /> Orange County should negotiate these costs <br /> <br />Outcome <br />- BOCC comments / feedback <br />- Tower funding in March, 2014 CIP <br />- Radio Tower/Infrastructure Report approval by BOCC <br /> <br /> Jim Groves reviewed the maps and said a lot of the issues with coverage are due to <br />terrain and the original design of the system. He referred to the map titled New “talk-in” – <br />Portable Radio, and he noted the concentric circles, which mark the site of the Chatham tower <br />site. He said this indicates a shadow effect, and it indicates bad coverage. He said there is <br />discussion and study regarding moving the tower antennae down to a lower height to fix this <br />issue. <br /> Chair Jacobs asked if there is a number assigned to the percentage of expected <br />improvement in coverage associated with the recommended changes. <br /> Jim Groves said he does not have that information. <br /> Chair Jacobs asked that this be provided to Board of County Commissioners if it <br />becomes available in the future. <br /> Commissioner McKee asked for clarification about the tower height for the VHF sites. <br /> Jim Groves said if you raise the tower height here the coverage will improve. <br /> Commissioner McKee asked if the Cedar Grove and Orange Grove towers would be <br />appropriate for increasing height. <br /> Jim Groves said these two sites were set up at less than 200 feet. <br /> Chair Jacobs said, at the time that tower height regulations were set, there was concern <br />about bird kills with taller towers. <br /> Commissioner Rich asked about the decreased antennae height referenced earlier. <br /> Jim Groves said the Chatham Mountain antenna is almost at 1,000 feet, and it will be <br />moved down to about 600 feet. He said these two towers are 200 feet or less. <br /> Commissioner Rich asked if this height is sufficient. <br /> Jim Groves said it can work. He said if there could be a 400 foot tower site, it might <br />bring the need down to 2 or 3 towers instead of 5. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.