n <br />$600,000 co -build with the Town of Chapel Hill. Year 4 (FY 2018 -19) includes $2.1 million for <br />one co -build with the Town of Chapel Hill, and one stand -alone substation. An additional stand- <br />alone substation is planned in Years 6 -10. Note: the initial two substations in FY 2016 -17 have <br />been pushed back one year from the current CIP. <br />9 -1 -1 Back -up Center (CIP page 44) — includes $369,499 in Year 1 (FY 2015 -16) to provide a 9- <br />1-1 Back -up Communications Center at the West Campus Office Building in Hillsborough. The <br />NC 9 -1 -1 Board requires that all Public Safety Answering Points (PSAPs) have a back -up plan, <br />no later than July 1, 2015, in the event of an outage or abandonment of the primary 9 -1 -1 <br />Center. This project will be funded with 9 -1 -1 funds. <br />County Capital projects (associated with Community Centers discussion) — Highlights <br />Cedar Grove Community Center (CIP page 20) - includes $2,822,226 in current year (FY 2014- <br />15) for construction and adaptive reuse of the former Northern Human Services Center. <br />Cedar Grove Community Center Library Kiosk (CIP page 24) — includes $180,000 in Year 1 (FY <br />2015 -16) to provide patrons an automated material kiosk at the Cedar Grove Community <br />Center providing 24 hour electronic access for checking in and out materials. <br />Historic Rogers Road Neighborhood Community Center (CIP page 37) — during FY 2012 -13, <br />the Board of Commissioners approved the establishment of capital project for the construction <br />of a Historic Rogers Road Neighborhood Community Center with funds of $650,000. For Year <br />1 (FY 2015 -16), $260,000 is budgeted, which includes the County's 43% share of a Phase II <br />Study, and construction costs of $3,025,000 in Year 2 (FY 2016 -17) for the County's 43% share <br />of OWASA's Sewer Concept plan to provide sewer to 86 parcels identified by the Historic <br />Rogers Road Neighborhood Task Force. <br />Efland- Cheeks Community Center Upfit (CIP page 38) — includes approximately $425,000 in <br />Year 5 (FY 2019 -20) for an upfit/interior renovation to the current facility, including new <br />equipment and furnishings, as well as area landscaping. <br />County Capital Park projects — Highlights <br />Blackwood Farm Park (CIP page 45) — includes $150,000 in Year 2 (FY 2016 -17) for final <br />design and construction drawings, with Park construction funds of $1,900,000 in Year 3 (FY <br />2017 -18), and approximately $1,100,000 in Year 4 (FY 2018 -19) for a permanent parks <br />operations base. Note: the parks operations base has moved up one year from the current <br />CIP. <br />Soccer.com Soccer Center (Phase 11) (CIP page 50) — this represents an investment in the <br />current facility (formally named Eurosport Soccer Center), with $425,000 included in Year 1 (FY <br />2015 -16) for possible land acquisition for future expansion; Design costs of $250,000 in Year 4 <br />(FY 2018 -19); and approximately $4.6 million in Year 5 for the construction of new artificial turf <br />fields, tennis courts, parking, restrooms /equipment building, equipment, and stormwater <br />controls. Note: Possible land acquisition has moved up one year from the current CIP. <br />Millhouse Road Park (CIP page 52) — this project reflects a possible Town of Chapel Hill /County <br />partnership concept for this project. Includes $100,000 in Year 2 (FY 2016 -17) for design, <br />