Browse
Search
Agenda - 04-09-2015 - 1 & 4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 04-09-2015 - Budget Work Session
>
Agenda - 04-09-2015 - 1 & 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:40:30 AM
Creation date
4/6/2015 8:54:38 AM
Metadata
Fields
Template:
BOCC
Date
4/9/2015
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1 & 4
Document Relationships
Minutes 04-09-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Southern Human Services Center Expansion (CIP page 22) — a full site master plan Special <br />Use Permit ( "SUP ") was approved in June 2014, providing the Board adopted guidance <br />regarding expansion and remodeling to accommodate future Human Services and other <br />identified County needs. The facility will be programmed to follow logical and timely <br />development of the master plan and Space Study work group recommendations. This includes <br />$75,000 in Year 1 (FY 2015 -16) for schematic design services to assist in visioning the <br />expanded space and its potential uses, and $6,475,000 in Year 2 (FY 2016 -17) for the <br />expansion, which includes a Dental Clinic. <br />Southern Branch Library (CIP page 23) — funding of $600,000 was approved in FY 2013 -14 for <br />possible land purchase; Design and engineering work of $472,500 is included in Year 1 (FY <br />2015 -16), and construction costs of $5,625,000 and $750,000 in equipment and furnishings are <br />included in Year 2 (FY 2016 -17). Note: construction costs for this project have been reduced <br />from the current CIP by approximately $1,400,000, based on a 15,000 square foot facility and <br />50 dedicated parking spaces. <br />Main Branch Library Remodel (CIP page 25) — the need for an upfit and re- design of the Main <br />Branch Library was identified both in the County Space Needs Study and the 2012 Community <br />Needs Assessment portion of the Library's strategic plan. To accommodate current and future <br />users, the library must make better use of the existing space by focusing on maximizing its <br />flexibility and adaptability. This includes a total of $1,200,000 in Years 6 -10 for design, <br />construction, and equipment/furnishings. <br />Proposed Jail (CIP page 30) — total project costs of approximately $21,600,000, with site related <br />planning costs of $500,000 in Year 1 (FY 2015 -16), architectural /engineering costs of $500,000 <br />in Year 2 (FY 2016 -17), with the construction of a new 144 bed jail in Year 3 (FY 2017 -18). <br />Note: construction costs for this project have been reduced from the current CIP by <br />approximately $4,100,000 due to building an initial 144 bed capacity, down from the 216 bed <br />capacity in the current CIP, with expansion potential of up to a 250 bed capacity. <br />Environment and Agriculture Center (CIP page 32) — includes $300,000 in Design Services in <br />Year 1 (FY 2015 -16), and construction costs of approximately $3,100,000 in Year 2 (FY 2016- <br />17) for a new center at the current Revere Road site. The current Center on the property will be <br />deconstructed to allow for a new parking area. Note: this project has moved up one year from <br />the current CIP. <br />Life Safety — ADA (CIP page 35) — provides $25,000 in current year (FY 2014 -15) for the <br />installation of automated access doors at West Campus and the Seymour Senior Center; <br />$35,000 in Year 1 (FY 2015 -16) for fire alarm system improvements /replacement/install at the <br />Historic Courthouse and Efland Community Center; $60,000 in Year 2 (FY 2016 -17) for elevator <br />improvements at the Historic Courthouse; $55,000 for fire alarm system design and installation <br />at 3 locations in Year 4 (FY 2018 -19); and additional fire alarm system design and installation at <br />4 locations ($120,000 in Years 6 -10). <br />Emergency Services Substations (CIP page 42) - funding for this project will enable the <br />construction of 4 new co -built EMS stations and 2 stand -alone substations in geographical <br />areas across the County that will help reduce response times. Year 2 (FY 2016 -17) includes <br />$1.2 million for 2 co- builds, both with the Town of Hillsborough. Year 3 (FY 2017 -18) includes a <br />
The URL can be used to link to this page
Your browser does not support the video tag.