Browse
Search
Agenda - 04-07-2015 - 6j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 04-07-2015 - Regular Mtg.
>
Agenda - 04-07-2015 - 6j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:34:17 AM
Creation date
4/2/2015 2:57:32 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6j
Document Relationships
Minutes 04-07-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Strength reinforced by mounting <br />Horton's dynamic testing has shown the standard .33" center bolt in <br />OEM mounting pucks to shear in accidental forces greater than <br />10Gs (roughly a 15 mph collision). In some cases, this can actually <br />cause the module to separate from the frame rails. As a result, <br />Horton developed a stronger and more reliable mounting system — <br />VI -Tech. The VI -Tech mounting system uses three failsafe flanges, <br />two elastomer isolators and a .75" center bolt, tested and proven to <br />retain mounting in 35G impact crashes. As an added benefit, VI- <br />Tech improves ride quality with reduced noise and a smoother ride. <br />Third -party validation <br />7 <br />At Horton, we believe the best way to conduct testing is through third -party facilities. While some might find in -house <br />testing to be more economically reasonable, there are several distinct advantages to using a third party for testing. <br />These include: <br />• Unbiased assessment of quality and assembly <br />• Independent perspective in testing process <br />• Professionals that specialize in the area of testing <br />• More accurate reporting and results <br />Horton uses several third -party testing companies with differing specialties including CTL Engineering, Transportation <br />Research Center Inc., IMMI CAPE® (the Center for Advanced Product Evaluation), Progressive Engineering Inc. and <br />Bosch Testing Facility. <br />And testing isn't limited just to safety. All features introduced as Horton standards have been tested and proven to stand <br />up in performance, durability and reliability. <br />_1�: <br />I� <br />I <br />�I <br />In the comparison of ambulance features, testing results are the voice of reason. Horton continues to <br />outperform all other products available on the market and we have the results to prove it. <br />We dare you to compare. <br />� ; Horton <br />IIIIIIIIIIIIIIIIIIIN EMERGENCY VEHICLES <br />hortonambu lance. com info @hortonambulance.com 800.282.5113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.