2015-161-E Planning - J.F. Wilkerson Contracting Company, Inc. for Final Change Order for Buckhorn-Mebane Phase 2 Water and Sewer $62,215.11
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-161-E Planning - J.F. Wilkerson Contracting Company, Inc. for Final Change Order for Buckhorn-Mebane Phase 2 Water and Sewer $62,215.11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2016 2:32:42 PM
Creation date
3/24/2015 12:03:14 PM
Metadata
Fields
Template:
BOCC
Date
3/24/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-161-E Planning - J.F. Wilkerson Contracting Co., Inc. - Final Change Order for Buckhorn-Mebane Phase 2 Water and Sewer
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:OEE5F167-D7B1-41B1-A2DC-6B885C50EO84 <br /> Contractor: J.F. Wilkerson Contracting Co,, Inc <br /> Engineer: Hobbs Upchurch Associates <br /> Owner: Orange County <br /> Job: Buckhorn—Mebane EDD Phase 2 <br /> Project Manager: Michael Coates <br /> Request number: 7(Revised Final Decision February 5,2014) <br /> Date: February 21, 2014(Revised June 27,2014) <br /> Sewer Line S-1 <br /> Change Order Request <br /> Description of extra work: <br /> Meeting,planning,surveying Sewer Line S-1 re-alignment from MH 2 to MH 4 <br /> AKA"Pond Re-Alignment"near Gravely Lift Station <br /> Estimates taken from Sheet S 1.1 <br /> Additional Labor to Date <br /> Project Manager Office and Field Revisions 2,500 <br /> Truck and Travel LS 1500 1,500 <br /> Foreman Jimmy Gray 1 Day @ 500 500 <br /> Surveying alignment(around pond)inc.new MH 3,500 <br /> Surveving and staking original &new alignment(final revision) 3,500 <br /> Total Labor 11,500 <br /> Additions not covered in Contract <br /> Soil Testing Allowance (By Owner) <br /> New outlet pipe extension for pond 500.00 <br /> Pumping water out of pond to lower level 3,000.00 <br /> New MH Base for MH 2.MH 3 @1,000 2 000 00 <br /> Total Additions 59500.00 <br /> Total Additions and Labor 179000.00 <br /> 15% Overhead/Profit allowed 2.55000 <br /> Total Additional Compensation this Request: $19,550.00 <br /> Request for additional Days: 66 days (Denied) <br /> Note 1: <br /> J. F. Wilkerson Contracting does not recommend laying the 12"sewer line through the <br /> existing pond dam. Furthermore,J.F. Wilkerson Contracting will not guarantee the future <br /> water level of the pond,or the livability of fish, if any are affected by lowering the water <br /> level of the pond. <br /> Note 2: <br /> All pipe and man holes(additions and deletions)associated with this change order request <br /> will be billed as line items on the existing contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.