Browse
Search
Agenda - 03-17-2015 - 7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 03-17-2015 - Regular Mtg.
>
Agenda - 03-17-2015 - 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:22:20 AM
Creation date
3/13/2015 2:47:37 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes 03-17-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
ORD-2015-005 Budget Ordinance Amendment #6-B for the Cedar Grove Community Center
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 7 <br />[Departmental Use Only] <br />TITLE Cedar Grove Community Ctr <br />FY FY2014 -15 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement "), made as of the 17th day of <br />March, 2015, by and between Raccanelli Construction South, Inc., (hereinafter called the "Contractor "), and <br />Orange County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br />"County," .. Orange County," or "Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and /or field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br />c. Designer approved communications and /or field orders. <br />d. Request for Proposals and addenda thereto. <br />e. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to- Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />Construction Drawings prepared by MBAJ Architecture, PA, including the base bid condition, <br />Alternate 1, Alternate 2, Alternate 3, and Alternate 4. All references within the documents to <br />the name Boomerang Design refer to MBAJ Architecture, PA (Sheet sets (totaling 60 sheetes): <br />G101 -103; Survey Sheet; C0.0 -C6.5; A001 -A604; I801, 5101 -5102; P001 -P201; M001 -M403; <br />E001 -E601 dated 11- 11 -14, along with Addendum #1 dated ; Addendum 92 dated <br />February 6, 2015, Addendum 93 dated , and Addendum 94 dated ) <br />Revised 10/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.