Orange County NC Website
11 <br />c. In the event of a change in the Owner's statutory authority, mandate and /or mandated <br />functions, by state and /or federal legislative or regulatory action, which adversely affects <br />Owner's authority to continue its obligations under this Agreement, then this Agreement shall <br />automatically terminate without penalty to Owner upon written notice to Contractor of such <br />limitation or change in Owner's legal authority. <br />7. NOTICES <br />Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, <br />return receipt requested to the following: <br />Owner: <br />Orange County <br />Attn: Jeff Thompson <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />8. MISCELLANEOUS <br />Contractor: <br />Raccanelli Construction South, Inc. <br />1001 Pemberton Road, Suite 202 <br />Apex, NC 27502 <br />Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties <br />and Obligations imposed by state, federal or local law, rules, regulations and ordinances. <br />b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br />duty granted them under the Contract Documents, nor shall any act or failure to act constitute <br />any approval except as specifically agreed in writing. <br />The Work shall be tested and inspected as required by the Contract Documents and as required <br />by law. Unless prohibited by law the costs of all such tests and inspections related to state and <br />federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building <br />Codes shall be borne by the Contractor. The costs for material and structural testing shall be <br />conducted by an independent third party at the expense of the Owner. Delays related to any of <br />the aforementioned tests and inspections shall not be grounds for delaying the completion of <br />the work. If any such tests and inspections reveal deficiencies in the Work such that the Work <br />does not comply with terms or requirements of the Contract Documents and /or the <br />requirements of any code or law the Contractor is solely responsible for the cost of bringing <br />such deficiencies into compliance with the terms of the Contract Documents and /or any code <br />or law. <br />d. Should the Designer, if a Designer is retained for the project involving the Work, or Owner <br />reject any portion of the Work for failing to comply with the Contract Documents Contractor <br />shall immediately, at Contractor's expense, correct the Work. Any such rejection may be <br />made before or after substantial completion. If applicable, any additional expense borne by the <br />Designer under this section shall be paid at Contractor's expense. <br />e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its <br />entirety without the prior written consent of the Owner. <br />9. CONSEQUENTIAL DAMAGES <br />Revised 10/14 5 <br />