Browse
Search
Agenda - 03-17-2015 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 03-17-2015 - Regular Mtg.
>
Agenda - 03-17-2015 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:22:02 AM
Creation date
3/13/2015 2:30:53 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes 03-17-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C! <br />Recommendation: The SAPFOTAC reviewed and discussed the most recent student <br />generation rate analysis included in the 2014 TischlerBise report. The SAPFOTAC <br />recommends the BOCC and other governing boards accept the new rates as reported <br />in Attachment II.E.1 on page 44 (at the bottom of the page) of the report as the <br />standard for the SAPFO and CAPS system. Once the report is adopted by the BOCC <br />at the May 19, 2015 meeting, these new rates will become the standard for the SAPFO <br />and CAPS system. <br />9. Access to Full Report <br />The draft SAPFOTAC report will be posted on the Orange County Planning Department's <br />web site. A letter and the Executive Summary of the report will be sent to all SAPFO <br />partners after this BOCC meeting advising them of the availability of the draft report and <br />inviting comment. It is anticipated the draft 2015 SAPFOTAC report will be brought back <br />to the BOCC for certification at the May 19, 2015 regular meeting. <br />FINANCIAL IMPACT: Current 10 -year student growth projections show future needs for <br />additional schools in the CHCCS District. Elementary School #12 is projected to be needed in <br />2023 -24 and Middle School #5 is projected to be needed in 2023 -24. In the OCS District, <br />additional High School level capacity is projected to be needed in 2022 -23. <br />Section 7 of the Schools Adequate Public Facilities Memorandum of Understanding (MOU) <br />states, "Orange County will use its best efforts to provide the funding to carry out the Capital <br />Improvement Plan referenced in Section 1 above." <br />RECOMMENDATION(S): The Manager recommends the Board: <br />1. Receive the 2015 SAPFOTAC Annual Report; and <br />2. Authorize the Chair to sign the transmittal letter to SAPFO partners contained <br />in Attachment 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.