Browse
Search
Agenda - 03-17-2015 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 03-17-2015 - Regular Mtg.
>
Agenda - 03-17-2015 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:22:02 AM
Creation date
3/13/2015 2:30:53 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes 03-17-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />Section I <br />School levels. level. No changes at Middle or High School <br />2006: No changes at Elementary, Middle, or High levels. <br />School levels. <br />2007: An increase of 800 at the High School level <br />with the opening of Carrboro High School. <br />2008: An increase of 323 at the Elementary <br />School level due to the opening of Morris Grove <br />Elementary School and the implementation of the <br />1:21 class size ratio in grades K -3 <br />2009: No changes at Elementary, Middle, or High <br />School levels. <br />2010: An increase in capacity of 40 students at the <br />High School level with Phoenix Academy High <br />School becoming official high school within the <br />district <br />2011: No changes at Elementary, Middle, or High <br />School levels. <br />2012: No changes at Elementary, Middle, or High <br />School levels. <br />2013: An increase in capacity of 585 students due <br />to the opening of Northside Elementary School. <br />2014: An increase in capacity of 104 students due <br />to the opening of the Culbreth Middle School <br />addition. <br />2005: An increase in capacity of 100 at <br />Hillsborough Elementary with the completion of <br />renovations. <br />2006: An increase in capacity of 700 at the <br />Middle School level with the completion of <br />Gravelly Hill Middle School and an increase of 15 <br />at the High School level with the temporary <br />location of Partnership Academy Alternative <br />School. An increase of 2 at the Elementary level <br />due to a change in the capacity calculation for each <br />grade at each school. <br />2007: No changes at Elementary, Middle, or High <br />School levels. <br />2008: A decrease of 228 at the Elementary School <br />level due to the implementation of the 1:21 class <br />size ratio in grades K -3 and an increase of 25 at the <br />High School level with the completion of the new <br />Partnership Academy Alternative School. <br />2009: No changes at Elementary, Middle, or High <br />School levels. <br />2010: No changes at Elementary, Middle, or High <br />School levels. <br />2011: No changes at Elementary, Middle, or High <br />School levels. <br />2012: No changes at Elementary or Middle School <br />levels. A decrease of 119 at High School level as a <br />result of a N.C. Department of Public Instruction <br />(DPI) study. <br />2013: No changes at Elementary, Middle, or High <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.