Browse
Search
Agenda - 03-17-2015 - 6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 03-17-2015 - Regular Mtg.
>
Agenda - 03-17-2015 - 6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:22:02 AM
Creation date
3/13/2015 2:30:53 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes 03-17-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />High School Level <br />A. Does not currently exceed the 110% LOS standard (current LOS is 96.3 %). <br />B. The projected growth rate at this level is expected to decrease, but remain positive <br />over the next 10 years (average —1.22% compared to 1.24% over the past 10 years). <br />C. Projections are not showing a need for an expansion of Carrboro High School from <br />the initial capacity of 800 students to the ultimate capacity of 1,200 students in the 10 <br />year projection period. This is different than last year's projections which showed a <br />need in 2023 -24. <br />ORANGE COUNTY SCHOOL DISTRICT <br />Elementary School Level <br />A. Does not currently exceed 105% LOS standard (current LOS is 88.2 %). <br />B. The projected growth rate at this level is expected decrease, but remain positive over the <br />next 10 years (average —0.55% compared to 1.5% over the past 10 years). A new charter <br />school, The Expedition School, opened in Hillsborough this year and accepts students <br />from all over. Part of the slowing growth rate could be due to students transferring to the <br />new charter school. <br />C. Projections are not showing a need for an additional Elementary School in the 10 year <br />projection period. This is different than last year's projections which showed a need in <br />2023 -24. <br />Middle School Level <br />A. Does not currently exceed 107% LOS standard (current LOS is 81.3 %). <br />B. The projected growth rate at this level is expected to decrease, but remain positive over <br />the next 10 years (average —0.09% compared to 0.48% over the past 10 years). <br />C. Similar to last year, projections are not showing a need for an additional Middle School <br />in the 10 year projection period. <br />High School Level <br />A. Does not currently exceed 110% LOS standard (current LOS is 102.6 %). <br />B. The projected growth rate at this level is expected to decrease, but remain positive over <br />the next 10 years (average —0.39% compared to 2.6% over the past 10 years). <br />C. Expansion of Cedar Ridge High School from the initial capacity of 1,000 students to <br />1,500 students is projected to be needed in 2022 -23. This is the same as last year's <br />projections. <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.