Browse
Search
Agenda - 03-17-2015 - 5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 03-17-2015 - Regular Mtg.
>
Agenda - 03-17-2015 - 5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:24:38 AM
Creation date
3/13/2015 1:54:42 PM
Metadata
Fields
Template:
BOCC
Date
3/17/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes 03-17-2015
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2015
RES-2015-016 Resolution Authorizing the Orange Public Transportation Americans With Disabilities Act (ADA) Paratransit Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />ORANGE COUNTY <br />NORTH CAROLINA <br />ORANGE PUBLIC TRANSPORTATION ADA PARATRANSIT PLAN <br />described in the Description of Current Paratransit Services section of this document will be <br />implemented and will apply to the new and expanded services. The same eligibility <br />determination process will also apply to the new and expanded fixed -route services. <br />Estimate of Demand and Description of Estimation Methodologv: <br />The current demand for ADA paratransit service in OPT's fixed -route ADA service area is <br />estimated at 2.7 paratransit trips per day (based on 2014 data). This estimation is based on <br />an assumption that approximately four (4) percent of trips associated with fixed -route <br />service would be provided as ADA paratransit trips and borrows from the experience of a <br />similar system in a similar hybrid rural /urban environment, Apple Country Transit in <br />Hendersonville, North Carolina. Experiences of other providers in the Triangle region range <br />from a low of approximately 0.9 percent for Chapel Hill Transit to a high of approximately <br />7.1 percent for C -Tran, the Town of Cary's local public transportation provider. As such, the <br />four (4) percent assumption lies safely in the middle of the range for the region. When <br />OPT's fixed -route ADA service area expands in the spring of 2015, demand is estimated to <br />increase to approximately eight (8) paratransit trips per day. <br />Complementary ADA paratransit trips are generally more expensive to provide than fixed - <br />route trips or ADA paratransit trips provided as deviations from fixed -route service. <br />However, given that a good portion of OPT's existing service is provided in a demand <br />response format, OPT can continue to realize the cost per trip benefit of combining <br />complementary ADA paratransit trips with demand response trips provided for other <br />purposes. Consequently, the use of OPT's existing cost per trip for the system is a good <br />estimation of the cost per trip for those dispatched to service ADA paratransit clients. The <br />current cost per trip for OPT's demand response service (using 2014 data), including both <br />pure operating and administrative costs, is $12.85. Assuming a demand of eight (8) ADA <br />paratransit trips per day and 2,000 per year based on an assumption of there being 250 <br />days of service per year, the total cost to provide these trips is anticipated to be $25,700 per <br />year with an escalation of approximately three (3) percent per year to account for <br />inflation /increases in costs overtime. <br />Operating and Capital Budget for Proposed ADA Paratransit Service. <br />The operating budget for proposed ADA paratransit service for the next five (5) years is <br />provided in Table 2 and is based on the estimation of demand explained in the previous <br />section. <br />Table 2: Five -Year ADA Paratransit Service Operating Budget <br />Year <br />FY 2016 <br />FY 2017 <br />FY 2018 <br />FY 2019 <br />FY 2020 <br />Budget <br />$27,265 <br />$28,083 <br />$28,926 <br />$29,793 <br />$30,687 <br />Based on the anticipated cost per year to absorb the estimated demand for ADA paratransit <br />service and in the manner it is anticipated to be provided, no additional capital needs are <br />foreseen as necessary. OPT vehicles used for fixed -route service that may deviate to <br />provide service to an ADA - eligible client are ADA - accessible and equipped with lifts. OPT <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.