Browse
Search
2015-151-E AMS - Owens Roofing, Inc. for Skills Development Center-Sector A Roof Replacement $99,209
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-151-E AMS - Owens Roofing, Inc. for Skills Development Center-Sector A Roof Replacement $99,209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 8:12:10 AM
Creation date
3/12/2015 2:39:05 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-151-E AMS - Owens Roofing, Inc. for Skills Development Center-Sector A Roof Replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F8FCAFA8-FBB2-47AF-964F-11 E53C70E4A1 <br /> Orange County Asset Management <br /> Roof Replacement—Sector A-Skills Development Center,Chapel Hill,NC <br /> PROPOSAL FORM <br /> General Items <br /> A. Insurance Lump Sum &S.) $1,9g0.00 <br /> B. Mobilization L.S. $ 2,970.00 <br /> C. Warranty L.S. $ 1,000.00 <br /> Subtotal--General Items L.S. $ 5,950.00 <br /> Work Items <br /> A. Remove and dispose of existing roof system L.S. $ 20,000.00 <br /> B. Remove and replace damaged or deteriorated wood <br /> Allowance L.S. $___500 <br /> $ /Bd.Ft. <br /> C. Furnish and install new wood blocking L.S. $ 759.00 <br /> D. Furnish and install new board insulation system L.S. $ 27,500.00 <br /> E. Furnish and install new polymer modified L.S. $ 339660.00 <br /> Bituminous membrane roof system to include all <br /> flashings and related accessories <br /> F. Furnish and install new shect metal flashing L.S. $ 8000.00 <br /> G. Furnish and install new skylight L.S. $ 1,600.00 <br /> H. Furnish and install other items not specifically included <br /> or listed herein L.S. $ 1,240.00 <br /> Subtotal—Work Items L.S. $ 93,259.00 <br /> Total Bid Price—(General Items and Work Items) L.S. $ 99.209.00 <br /> TOTAL BID PRICE: Bidder agrees to perform.all of the work described in the specifications and shown <br /> on the plans for the sum of <br /> Ninety Nine Thousand Two Hundred Nine&00/100------Dollars (99 209.00 ) <br /> (Amount shall be shown in both words and figures.) <br /> In the case of a discrepancy in the pricing, unit prices will control; if there is no unit price, the lump sum <br /> price will control; totals shall be corrected to be consistent with the unit prices and lump sum prices. The <br /> total base bid price shall be the sum of all unit cost extensions and line items listed. <br /> Should the actual quantities be increased or decreased relative to the estimated quantities included in the <br /> Proposal, the Unit Prices shown will be used to adjust the contract price in accordance with the contract <br /> documents throughout the life of the contract. <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.