Browse
Search
2015-151-E AMS - Owens Roofing, Inc. for Skills Development Center-Sector A Roof Replacement $99,209
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-151-E AMS - Owens Roofing, Inc. for Skills Development Center-Sector A Roof Replacement $99,209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 8:12:10 AM
Creation date
3/12/2015 2:39:05 PM
Metadata
Fields
Template:
BOCC
Date
3/12/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-151-E AMS - Owens Roofing, Inc. for Skills Development Center-Sector A Roof Replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F8FCAFA8-FBB2-47AF-964F-11 E53C70E4A1 <br /> Orange County Asset Management <br /> Roof Replacement—Sector A-Shills Development Center, Chapel Hill,NC <br /> PROPOSAL FORM <br /> Proposal of Owens Roofing,Inc. (herein after called Bidder)a Corporation organized <br /> and existing under the Laws of the State of NC _ <br /> Insert corporation,partnership or individual as applicable <br /> To: Orange County Asset Management(herein after called Owner). <br /> Gentlemen: r <br /> The Bidder, in compliance with the bid for Roof Replacement — Sector A-Skills Development Center, <br /> Chapel Hill, North Carolina, having examined the Contract Documents prepared of the work by SthWall <br /> Building Diagnostics Consultants,dated October 2014, and addenda,and the site of the proposed work, and <br /> being familiar with all of the conditions surrounding the construction of the proposed project including the <br /> availability of materials, and supplies, agrees to construct the project in accordance with the Contract <br /> Documents, within the time set forth therein, and the prices stated below. These prices .are to cover all <br /> expenses incun•ed in performing the work required under the Contract Documents, of which this proposal is <br /> a part. <br /> Bidder further agrees that the amounts and quantities of materials be furnished and work to be done, as <br /> stated in the Instructions to Bidders,the General Conditions; Supplementary Conditions, and the Technical <br /> Specifications and Drawings, are recognized by it to be a full and complete indication of the work in its <br /> fullest and most complete sense, and that it is satisfied with such Notice etc., in determining the prices for <br /> the several classes of work as_specified, and will not at any time dispute or complain that there is any <br /> misunderstanding in regard to the nature or amount of materials to be furnished and work to be done. <br /> i <br /> Bidder hereby agrees to commence work under the contract on or before a date to be specified in writing <br /> known as "Notice to Proceed" and to fully complete the project within 30 consecutive calendar days <br /> thereafter as stipulated. B.)rider further agrees to pay liquidated damages in the amount of$200 per day, per <br /> building,for each and every day the project remains incomplete beyond the scheduled completion date. <br /> Bidder acknowledges receipts of the following addenda: <br /> Number I Date: 12.15. 4 Number Date: <br /> Number Date: Number Date: <br /> i <br /> Page l <br />
The URL can be used to link to this page
Your browser does not support the video tag.