Browse
Search
Agenda - 03-05-2015 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 03-05-2015 - Work Session - Late
>
Agenda - 03-05-2015 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 9:16:02 AM
Creation date
3/2/2015 3:54:17 PM
Metadata
Fields
Template:
BOCC
Date
3/5/2015
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Environment and Agriculture Center — includes $300,000 in Design Services in Year 1 (FY <br />2015 -16), and construction costs of approximately $3,100,000 in Year 2 (FY 2016 -17) for a new <br />center at the current Revere Road site. The current Center on the property will be <br />deconstructed to allow for a new parking area. Note: this project has moved up one year from <br />the current CIP. <br />Historic Rogers Road Neighborhood Community Center — During FY 2012 -13, the Board of <br />Commissioners approved the establishment of capital project for the construction of a Historic <br />Rogers Road Neighborhood Community Center with funds of $650,000. For Year 1 (FY 2015- <br />16), $260,000 is budgeted, which includes the County's 43% share of a Phase II Study, and <br />construction costs of $3,025,000 in Year 2 (FY 2016 -17) for the County's 43% share of <br />OWASA's Sewer Concept plan to provide sewer to 86 parcels identified by the Historic Rogers <br />Road Neighborhood Task Force. <br />Efland- Cheeks Community Center Upfit — includes approximately $425,000 in Year 5 (FY 2019- <br />20) for an upfit/interior renovation to the current facility, including new equipment and <br />furnishings, as well as area landscaping. <br />Emergency Services Substations — Funding for this project will enable the construction of 4 new <br />co -built EMS stations and 2 stand -alone substations in geographical areas across the County <br />that will help reduce response times. Year 2 (FY 2016 -17) includes $1.2 million for 2 co- builds, <br />both with the Town of Hillsborough. Year 3 (FY 2017 -18) includes a $600,000 co -build with the <br />Town of Chapel Hill. Year 4 (FY 2018 -19) includes $2.1 million for one co -build with the Town <br />of Chapel Hill, and one stand -alone substation. An additional stand -alone substation is planned <br />in Years 6 -10. Note: the initial two substations in FY 2016 -17 have been pushed back one <br />year from the current CIP. <br />Blackwood Farm Park — includes $150,000 in Year 2 (FY 2016 -17) for final design and <br />construction drawings, with Park construction funds of $1,900,000 in Year 3 (FY 2017 -18), and <br />approximately $1,100,000 in Year 4 (FY 2018 -19) for a permanent parks operations base. <br />Note: the parks operations base has moved up one year from the current CIP. <br />Soccer.com Soccer Center (Phase 11) — This represents an investment in the current facility <br />(formally named Eurosport Soccer Center), with $425,000 included in Year 1 (FY 2015 -16) for <br />possible land acquisition for future expansion; Design costs of $250,000 in Year 4 (FY 2018- <br />19); and approximately $4.6 million in Year 5 for the construction of new artificial turf fields, <br />tennis courts, parking, restrooms /equipment building, equipment, and stormwater controls. <br />Note: Possible land acquisition has moved up one year from the current CIP. <br />Millhouse Road Park — This project reflects a possible Town of Chapel Hill /County partnership <br />concept for this project. Includes $100,000 in Year 2 (FY 2016 -17) for design, engineering, and <br />preconstruction costs; and $6,400,000 in Year 3 (FY 2017 -18) for Park construction, including a <br />soccer field complex, walking trails, and other amenities. This joint facility is reflected in both <br />the Town and County's Parks and Recreation Master Plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.