Browse
Search
2015-144-E AMS - 5th Wall Building Diagnostics Consultants for Roof Replacement Design and Consulting Services at Blackwood Cates Farms Houses $6,900
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-144-E AMS - 5th Wall Building Diagnostics Consultants for Roof Replacement Design and Consulting Services at Blackwood Cates Farms Houses $6,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 8:24:26 AM
Creation date
3/2/2015 2:25:04 PM
Metadata
Fields
Template:
BOCC
Date
3/2/2015
Meeting Type
Work Session
Document Type
Contract
Agenda Item
Manager signed
Document Relationships
R 2015-144-E AMS - 5th Wall Building Diagnostics Consultants for services at Blackwood Cates Farms Houses
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: C91DOR D8-58FA-4F8F-ABEB-899CF01A1 1`813 <br /> JeIT'l-hompson <br /> Roof replacernent design and consulting services <br /> Blackwood Farm House <br /> fates Farm House <br /> Hillsborough.N( <br /> 5thWall Proposal No. 15-02-06 <br /> FcbrUuy 2,2015 <br /> Page 2 <br /> Wind uplift <br /> Fire resistance ofthe roof ssembly <br /> Current codes and standards <br /> Drainage requirements <br /> Roof system type <br /> Non: At this time we anticipate that fiberglass asphalt shingles will be utilized. <br /> Warranty <br /> Sheet metal fleshings <br /> Perimeter and penetration terminations <br /> • Preparing an opinion of estimated construction cost <br /> • Preparing all opinion of estimated project schedule <br /> 13. Bidding <br /> 1. Attending Pre-Bid Conference <br /> 1 Preparing and distributing Minutes of[tie Pre-Bid Conference <br /> 3,. Preparing any required addenda to the plans and specifications <br /> 4. Addressing Contractor and Owner questions during the bid period <br /> 5. Assisting in review of bids and making appropriate recommendations <br /> C. Contract Administration <br /> I. Preparing the contract between Owner and Contractor <br /> 2. Reviewing,Contractor submittals <br /> 3. Attending Pre-Construction Conference <br /> 4. Preparing and distributing Minutes of the Pre-Construction Conference <br /> 5. Attending periodic progress meetings <br /> 6. Addressing Contractor and Owner questions during construction <br /> 7. Review Contractor I-lay Requests <br /> F). Construction I I onstruction Quality Assurance <br /> 1, Performing periodic site visits during construction to assure that work is being performed <br /> in accordance with the plans and specifications. <br /> During our site visits we will meet with your personnel, attend scheduled ineetings, check <br /> materials, observe construction in progress, examine completed work, and discuss future <br /> work, A report Summarizing our observations wi I I be provided to Orange County, <br /> Based oil our understanding of the Current scope of work, we anticipate the duration of <br /> construction to be approximately 21 consecutive calendar days. We recommend that site <br /> visits be performed at tut average frequency of one visit per week throughout the course <br /> of construction activity. The frequency of visits may vary depending oil tile nature of <br /> work taking place. Additionally, an increased number of visits are recommended at the <br /> beginning of tile project in order to assure a full understanding of requirements and <br /> needs. Therefore, we anticipate that approximately 10 visits will be required to assure <br /> 9601 Baileywick Rd • Raleigh, NC 27615 www5thwallbdc.com <br /> 919/616-4715 <br />
The URL can be used to link to this page
Your browser does not support the video tag.