Orange County NC Website
DocuSign Envelope ID: C91DOR D8-58FA-4F8F-ABEB-899CF01A1 1`813 <br /> JeIT'l-hompson <br /> Roof replacernent design and consulting services <br /> Blackwood Farm House <br /> fates Farm House <br /> Hillsborough.N( <br /> 5thWall Proposal No. 15-02-06 <br /> FcbrUuy 2,2015 <br /> Page 2 <br /> Wind uplift <br /> Fire resistance ofthe roof ssembly <br /> Current codes and standards <br /> Drainage requirements <br /> Roof system type <br /> Non: At this time we anticipate that fiberglass asphalt shingles will be utilized. <br /> Warranty <br /> Sheet metal fleshings <br /> Perimeter and penetration terminations <br /> • Preparing an opinion of estimated construction cost <br /> • Preparing all opinion of estimated project schedule <br /> 13. Bidding <br /> 1. Attending Pre-Bid Conference <br /> 1 Preparing and distributing Minutes of[tie Pre-Bid Conference <br /> 3,. Preparing any required addenda to the plans and specifications <br /> 4. Addressing Contractor and Owner questions during the bid period <br /> 5. Assisting in review of bids and making appropriate recommendations <br /> C. Contract Administration <br /> I. Preparing the contract between Owner and Contractor <br /> 2. Reviewing,Contractor submittals <br /> 3. Attending Pre-Construction Conference <br /> 4. Preparing and distributing Minutes of the Pre-Construction Conference <br /> 5. Attending periodic progress meetings <br /> 6. Addressing Contractor and Owner questions during construction <br /> 7. Review Contractor I-lay Requests <br /> F). Construction I I onstruction Quality Assurance <br /> 1, Performing periodic site visits during construction to assure that work is being performed <br /> in accordance with the plans and specifications. <br /> During our site visits we will meet with your personnel, attend scheduled ineetings, check <br /> materials, observe construction in progress, examine completed work, and discuss future <br /> work, A report Summarizing our observations wi I I be provided to Orange County, <br /> Based oil our understanding of the Current scope of work, we anticipate the duration of <br /> construction to be approximately 21 consecutive calendar days. We recommend that site <br /> visits be performed at tut average frequency of one visit per week throughout the course <br /> of construction activity. The frequency of visits may vary depending oil tile nature of <br /> work taking place. Additionally, an increased number of visits are recommended at the <br /> beginning of tile project in order to assure a full understanding of requirements and <br /> needs. Therefore, we anticipate that approximately 10 visits will be required to assure <br /> 9601 Baileywick Rd • Raleigh, NC 27615 www5thwallbdc.com <br /> 919/616-4715 <br />