Browse
Search
Agenda - 06-28-1994-IX-E
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 06-28-94 Regular Mtg.
>
Agenda - 06-28-1994-IX-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 2:32:49 PM
Creation date
2/24/2015 2:32:33 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-E
Document Relationships
Minutes - 19940628
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 4 <br /> PROPOSED ORDINANCE AMENDMENT <br /> ORDINANCE: ZONING ORDINANCE <br /> REFERENCE: ARTICLE 6.23.7 - Watershed Protection Overlay <br /> Districts (Stream Buffers) <br /> ARTICLE 6.23 .8 - Watershed Protection Overlay <br /> Districts (Sewage Disposal and <br /> Watersupply) <br /> ORIGIN OF AMENDMENT: —x_ Staff Planning Board <br /> BOCC Public <br /> Other: <br /> STAFF PRIORITY RECOMMENDATION: High Middle rx_ Low <br /> Comment: <br /> PUBLIC HEARING DATE: February 28, 1994 <br /> PURPOSE OF AMENDMENT: To allow for a reduction in the <br /> 150' building setback and 300' <br /> septic system setback adjacent to <br /> reservoirs and/or streams for lots <br /> created prior to January 1, 1994. <br /> IMPACTS/ISSUES: Article 6.23.7 requires that new structures <br /> be located at least 150 ' from a reservoir, or <br /> outside of the stream buffer, whichever is <br /> greater. Article 6.23 .8 requires that septic <br /> systems be located at least 300' from a <br /> reservoir or outside of the stream buffer, <br /> whichever is greater. <br /> Application of these setbacks may render some <br /> existing lots unbuildable, particularly those <br /> which were not subject to any watershed <br /> protection standards at the time of their <br /> creation. For example, the Bellechene East <br /> Subdivision, located adjacent to Lake Orange, <br /> was approved prior to the zoning of Cedar <br /> Grove Township and the application of <br /> watershed protection standards. Eighteen of <br /> the 30 lots are located entirely or almost <br /> entirely within 300 feet of Lake Orange, and <br /> would be unbuildable if the 300' septic <br /> system setback were applied. <br /> There are a number of other existing <br /> subdivision lots surrounding Lake Orange <br /> which may be unbuildable if the 300' septic <br /> setback and 150' building setback are <br />
The URL can be used to link to this page
Your browser does not support the video tag.