Orange County NC Website
a~ <br />~Ai#ilied <br />Engin±~rs~. <br />1414 Raleigh Road, Suite 305 <br />Chapel Hill, North Carolina <br />(919) 419-9802 (Fax 419-9803) <br />iVleeting Notes <br />UNC -Alternative Energy Analysis Landfill Gas Investigation 08029-00 <br />Project Project No. <br />University of North Carolina- Chapel Hill 3/25, 4/1 and 04/08/2008 <br />Owner <br />Review Meeting No. 5, 6 and 7 <br />Type of Meeting <br />Meeting Date <br />Page 1 of 3 ias <br />Page Typist <br />Present/Representing: <br />Gwen Harvey <br />Gayle Wilson <br />Michael Meagher <br />Paul Spire <br />Brain Ferrell <br />Bob Sallach <br />John Masson <br />Ray DuBose <br />William Tricomi <br />Pat Crawford (Partial- via phone) <br />Matt Lamb <br />Nick Travis (via phone) <br />Jerry Schuett <br />Orange County <br />Orange County <br />Orange County <br />Orange County <br />Orange County <br />Olver, Inc. <br />UNC-CH Facilities Planning <br />UNC-CH Energy Services <br />UNC <br />UNC <br />Richardson Smith Gardner <br />Energy Strategies <br />AfFliated Engineers <br />harvevCa7co.oranae.nc.us <br />awilson co.orange.nc.us <br />mmeagher(c~co.orange.nc.us <br />pspireCa~co.orange.nc.us <br />bferrel I .ca hp-I aw. co m <br />rsallach[cr)olver.com <br />JmassonCa~fac.unc.edu <br />ray. d u boseCa~ e n e ray. u n c. ed u <br />will tricomiCa7unc.edu <br />pat crawfordCa~unc.edu <br />matt rsgenaineers.com <br />ntravisCc~energystrat.com <br />Lchuett(c~aeiena.com <br />The meeting was held at UNC-CH to discuss some progress to date and the path forward for the Landfill Gas <br />project. The following items were discussed: <br />1. A draft copy of the landfill gas feasibility study has been completed by RSG and was distributed to <br />the County for review. Note that the capital costs have been updated to reflect a greater level on <br />instrumentation on the equipment at the landfill and the pipeline cost have been updated to reflect a <br />more circuitous routing path along DOT highways. <br />2. The economic model was reviewed. It was noted that four major risks impact the project. These <br />are: <br />a. Over estimation of MFG quantity <br />b. Failure of a carbon compliance market to be established <br />c. Spikes in NG pricing <br />d. Overrun of estimated capital costs <br />3. The most recent model was run with the following assumptions: <br />a. LFG quantity matches estimates in feasibility study . <br />b. Carbon compliance market starts in 2012 and carbon credit price is per Nicholas Institute <br />projections <br />Page 3 of 15 <br />