Browse
Search
Agenda - 04-15-2008-6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 04-15-2008
>
Agenda - 04-15-2008-6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:18:48 PM
Creation date
8/28/2008 10:00:54 AM
Metadata
Fields
Template:
BOCC
Date
4/15/2008
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20080415
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ..~ <br />1414 Raleigh Road, Suite 305 <br />Chapel Hill, North Carolina <br />(919) 419-9802 (Fax 419-9803) <br />UNC - Alternative Energy Analysis Landfill Gas Investigation <br />Project <br />University of North Carolina- Chapel Hill <br />Owner <br />Progress Review Meeting <br />Type or Meeting <br />IUleeting Notes <br />08029-00 <br />Project No. <br />02/04/2008 <br />Meeting Date <br />Page 2 of 2 ias <br />Page Typist <br />4. UNC will set up a meeting with the~Cogen personnel to discuss use of the landfill gas at the Cogen <br />site. Although this has the longest pipe 'run, it is a' location where the LFG can be fully utilized <br />immediately to offset coal consumption in the boilers. <br />5. RSG will investigate other sources of income for the project. The follawing were discussed: <br />a. Grants- KEPI program (Renewable Energy production Incentive). This is a federal program <br />that may possibly offer some grant money for the project. <br />b. Golden Leaf Fouridation -not likely as this is typically tied to job creation. <br />c. It was decided that a special appropriation from the State Legislature is not likely for this <br />project, based on UNC's experience with the OWASA reclaimed water system. <br />6. The final Agreement was discussed in general. It was decided that the Agreement would need to <br />define the following items: <br />a. Ownership and operation of equipment at landfill site (Flare, clean-up equipment, <br />compressors, etc.) <br />b. Access and easements at landfill site <br />c. Who is responsible for purchase and installation of the gas collection and flare system at the <br />landfill? <br />d. Permitting responsibilities <br />e. Timeline for implementation <br />f. Who retains carbon credits and how are they valued? <br />7. The next meeting is scheduled for February 21st at 10:30 am. <br />These minutes represent our best understanding of the discussions held and decisions reached at .the <br />meeting. Please advise the writer of any errors or omissions of substance. <br />Affiliated Engineers <br />Jerry A. Schuett, P.E. <br />Principal/Project Manger <br />
The URL can be used to link to this page
Your browser does not support the video tag.