Browse
Search
Agenda - 05-17-1994-IX-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 05-17-94 Regular Mtg.
>
Agenda - 05-17-1994-IX-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 2:13:29 PM
Creation date
2/23/2015 2:13:16 PM
Metadata
Fields
Template:
BOCC
Date
5/17/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-D
Document Relationships
Minutes - 19940517
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
li <br /> the county line, will be connected to OWASA mains when the same may <br /> be constructed in the area proximate to Piney Mountain Subdivision, <br /> and the cost of construction of facilities and connections to join <br /> this line to future OWASA lines shall be paid on a pro-rata basis <br /> by the owners of lots within the Piney Mountain Subdivision. <br /> Likewise, if for any reason OWASA is unable to or determines not to <br /> continue its agreement with the City of Durham providing for the <br /> City of Durham to receive and treat waste from Piney Mountain <br /> Subdivision through the line to be constructed hereunder, the <br /> owners of lots in Piney Mountain Subdivision shall be responsible <br /> for and shall pay to OWASA the cost of an appropriate line and <br /> connection to the OWASA sewer collection system as may be necessary <br /> to connect the Piney Mountain system to OWASA collector mains <br /> leading to OWASA's wastewater treatment facilities . Any such <br /> connection to OWASA's wastewater collector mains and wastewater <br /> treatment facilities shall be in accordance with the terms, <br /> conditions , restrictions and undertakings herein recited. <br /> 4 . In consideration of acceptance, operation and maintenance <br /> of the sewer main and related system facilities by Orange Water and <br /> Sewer Authority, the owners of properties to be connected to the <br /> sewer main to be constructed have agreed to pay and shall pay to <br /> Orange Water and Sewer Authority rates, fees and charges calculated <br /> by the Authority as those necessary to recover the costs of the <br /> services provided, including reasonable reserves for maintenance <br /> and replacement of the facilities necessary to provide the service <br /> to the Piney Mountain Subdivision, and a reasonable charge <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.