Orange County NC Website
i <br /> Mr. Geoff Gledhill r �^ <br /> November 22, 1993 <br /> Page Two <br /> completed, closely tracks the P <br /> included as part of the cooperative planning <br /> nt then joint adoption of the cooperative planning <br /> ens'v�e planatolclass�ify <br /> area agreeme + would have amended its P <br /> mean that Orange County as an "open space area" within which water and <br /> the University Station property fanned development such as University <br /> sewer lines could be extended to serve a P would be appropriate for rezoning <br /> Station. Were nthis r o occur, then the property <br /> d master plan pp project as indicated above under alternative one. <br /> an to accommodate the <br /> Under this second alternative, <br /> the changes necessary <br /> University Station development would not oneoingbprocess initiated <br /> between the <br /> thedevelopers , <br /> of <br /> but would take place as part °However, because adoption of the cooperative <br /> Hillsborough and Orange County. proposed <br /> planning area land use plan involves a much larger area than the p P <br /> University Station project, this affects the esently proposed which this <br /> Una Y <br /> process could be accomplished• lanning the <br /> ares land use plan would take place �n <br /> hearings on the cooperative p scheduled far <br /> February and August of next year with adoption potentially <br /> November. <br /> 3 +A gird alternative would also involve <br /> alternative,othe transition area( ) process. However, under t <br /> P area p <br /> might be enlarged to i ncorporate the proposed o University ongeCounty Station <br /> and Hillsborough e <br /> 9 Hillsborough <br /> The significance of this would g that, <br /> property in question, only <br /> would be involved in the zoning <br /> would be directly involved in the permit t uldPtake llongercthan alternative two <br /> consideration of this approach is that area land use plan <br /> because, following adoption of the cooperathie cooperative planning area would <br /> (presently anticipated for November, 1994) , <br /> have to be jointly zoned by Orange County and Hillsborough. <br /> Orange <br /> (4) The fourth alternative involves ve ane Buse unilateral n an text aand tmap that Wile nd County of an amendment to its coenpre - apply that classification to <br /> this action would anticipate then <br /> create an open space classifn anther words process <br /> (se- <br /> University Station property. <br /> eventual result of the completion of the cooperative planning p <br /> al number two above) but could be <br /> affectedlwould more StaticP <br /> the only property that would be <br /> directly a <br /> Once the plan were in place, then the developers could apply for <br /> property roval as outlined above in alternative <br /> corresponding rezonin g and master plan app <br /> number one. reed <br /> , especially in view <br /> Given the practical time con Verseems most appropriate' I believe that we aoun:y <br /> that pursuit of the fourth alternate p we discussed the need to have <br /> of the meeting tentatively scheduled for December er we between the Orange <br /> and Hillsborough boards. At •this December two questions: <br /> the Orange County board address the following <br />