Browse
Search
2015-137-E Planning - Hobbs Upchurch Associates, P.A. for additional engineering and surveying services $10,860
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-137-E Planning - Hobbs Upchurch Associates, P.A. for additional engineering and surveying services $10,860
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 3:12:47 PM
Creation date
2/20/2015 2:51:16 PM
Metadata
Fields
Template:
Contract
Date
2/18/2015
Contract Starting Date
11/4/2010
Contract Ending Date
4/1/2015
Contract Document Type
Contract Amendment
Amount
$10,860.00
Document Relationships
R 2015-137-E Planning - Hobbs Upchurch Associates, P.A. for additional engineering and surveying services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:879481CD-E306-4784-9294-DEA1E30B4717 <br /> ii% <br /> EXHIBIT A <br /> December 23, 2014 <br /> Howard Fleming,Jr. <br /> Orange County <br /> 131 W. Margaret Lane Suite 201 <br /> Hillsborough,NC 27278 <br /> Re: Additional Services for Contract Amendment#2A; Dated April 22, 2014 <br /> Mr. Fleming, <br /> Per our discussion HUA has completed the following items as directed; these services are not <br /> included in our contract. Listed below you will find our Change to Scope of Services and Fees: <br /> 1. Tree survey and relocate sewer easement at the end of Center Street. Work required <br /> included, Principal time 4 hours @ 140.00 per= 560.00, Survey crew 8 hours @ 100.00 <br /> per= 800.00, Engineer time 6 hours @ 140.00 per= 840.00, Survey cad to re-plat 4 <br /> hours @ 80.00 per= 320.00 Total : $2,520.00 <br /> 1 Floodplain analysis at pump station property Principal 6 hours @ 140.00 per=840.00, <br /> Engineer 2 hours @ 140.00 per=280.00, Survey cad 8 hours @ 80.00 per= 640.00 <br /> Total : $1,760.00.00 <br /> 3. Subdivision plat for pump station lot Principal 8 hours @ 140 per= 1,120.00, Engineer 8 <br /> hours @ 140 per= 1,120.00, Survey crew wetland boundary 18 hours @ 100 per_ <br /> 1,800.00, Survey cad time 24 hours @ 80.00 per= 1,920.00 Total : $5,960.00 <br /> 4. Revise plan to change rip rap check dams to coir wattles and add detail Engineer 1 hour <br /> @ 140 per= 140.00, Cad tech 6 hours @ 80 per= 480.00 Total : $620.00 <br /> Total Additional Service Request: $10,860.00 <br /> Thank you for your time and consideration in this matter. <br /> „ Reg s, <br /> David Lane <br /> Cc: Craig Benedict <br /> T910692-5616 I F 910 692 7342 I P.O.Box 17;7 N SOUTHL RN PINES,NC 28:66 y WWW.H088SUPCHURCH.COM <br /> SUPIIR'''I:RbR":M PI RF:ORRU'd1ANQ;E U"V.R @1f'NW.AQ3R IIII'NNII40VA.RIIVE Il)I SH31N <br />
The URL can be used to link to this page
Your browser does not support the video tag.