Orange County NC Website
1 <br /> 9 <br /> f 1994 CLG SURVEY AND PLANNING GRAh7 APPLICATION <br /> State Historic Preservation Office <br /> North Carolina Division of Archives and History <br /> L PROJECT INFORMATION (Please type or print with Mack ink) <br /> Project Title: Phase III of Orange Count�� Historic Resources Inventory_ <br /> nr_.mi Oran ge �w <br /> Project Type: Archaeological Survey: Architectural Survey: <br /> National Register Nominations: Other (specify): Preservation Plan <br /> Local Matching Funds: (non-federal) Attach separate list of necessary <br /> Donor: O e 92Hnty <br /> f <br /> Source: General Fund <br /> Bate Available: Available now but also on 711194 ,.�..•�� <br /> Rind (cash/other):- Gash Amount: E10.000 <br /> H, APPLICANT INFORMATION <br /> Contact Person: Marvin Collins Title: Plkn n Director <br /> Address: 306F Revere Road Hillsborou N.C. 27278 <br /> Telephone(s): 919 732-8181 Extension 2592 FAM 91„9jfi44-3002 <br /> t <br /> i Applicant Organization or Agency: Oran a Count <br /> Certified Local Government (date 'application/certification): 4 13 93 <br /> Local Project Coordinator:, Saxne as Contact Person see above <br /> 2 <br /> Address: <br /> Telephone: <br /> John L' Count MABMer 119/94 <br /> SIGNATURE AND TITLE: Officer of Sponso ' Or ' ation DATE <br /> M. ABSTRACT OF PROPOSED PROJE • <br /> On a separate sheet of paper, please describe in one well developed paragraph exactly what will be <br /> R accomplished with the grant and matching funds, including in-kind. Applications for architectural <br /> surveys should include an estimate of the number of acres and properties to be surveyed. Historic <br /> Preservation Office staff'are available for assistance in developing the project description, including <br /> an estinted budget. <br /> This abstract may also include one or two other paragraphs describing methods to be employed or <br /> information on how the proposed project fits into an overall plan of preservation activities for your <br /> f <br /> community. For example, if this is Phase H of a four-phased action plan, what was Phase I and when <br /> R was it completed, and how will Phases III and IV build on Phases I and II? PLEASE LIMIT THE <br /> t <br /> t <br /> ABSTRACT TO THREE DOUBLE-SPACED TYPEWRA7TEN PAGES. <br />