Browse
Search
Agenda - 02-19-2015 - E2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2015
>
Agenda - 02-19-2015 - Quarterly Public Hearing
>
Agenda - 02-19-2015 - E2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2015 8:37:09 AM
Creation date
2/18/2015 11:20:05 AM
Metadata
Fields
Template:
BOCC
Date
2/19/2015
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
E2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />103 <br />Emergency Access to Trail Systems at Orange County Parks <br />Draft Goal and Objectives <br />The following are draft goals and objectives for accommodating emergency service <br />personnel gaining access to people using trails at Orange County parks and nature <br />preserves administered by the Orange County Department of Environment, Agriculture, <br />Parks and Recreation ( DEAPR). <br />Orange County parks that currently have trails are Efland- Cheeks Park, Cedar Grove <br />Park, Fairview Park, River Park, and Little River Regional Park and Natural Area. The <br />Jones Creek Greenway connects Lake Hogan Farms with Morris Grove Elementary <br />School. Future trails are being designed for the future Blackwood Farm Park, Hollow <br />Rock Access Area, and at the Seven Mile Creek Preserve. <br />These draft goal and objectives are intended for review and comment by the Parks and <br />Recreation Council, the Emergency Services Department, and the Orange Unified <br />Transportation Board. <br />Overarching Goal: Trail systems will be designed and constructed to accommodate <br />the maximum enjoyment of trail users, however, in doing so, there will be considerations <br />for topography, sedimentation and erosion control, the avoidance of sensitive natural <br />and cultural resources, public safety, and the provision of staging areas for vehicles to <br />access trail users in times of emergency. <br />Objective #1 — Trails will be constructed and maintained with a minimum <br />clearance width of six feet (even if width of the trail tread is narrower) and a <br />minimum clearance height of eight feet. [Single -track bike trails at Little River <br />Park may have sections less than six feet of clearance.] <br />Objective #2 — Trail networks greater than one mile in total length will be marked <br />with periodic signs that specify distances from trailheads and with GPS reference <br />points for users to identify their location along the trail. <br />Objective #3 — Trails will be shown on maps displayed on kiosks located at <br />trailheads, and maps will be available from the park office (for parks that have an <br />office) and from the DEAPR Central Recreation Center in Hillsborough. <br />Objective #4 — Emergency Service vehicles will have access to trails in such a <br />way that larger vehicles can reach staging areas identified within the park (and <br />on maps) and smaller all- terrain vehicles (e.g., Gator) can access most sections <br />of the trail. Staging areas will be located where feasible within close proximity <br />(approximately' /4 mile) to any point along the trails. Keys to any gates/ bollards <br />Draft #2 — 7/24/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.