Browse
Search
2014-409 Planning - Park Construction of NC, Inc. for McGowan Sewer Interceptor Construction Change Order #1 $470,589.95
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2014
>
2014-409 Planning - Park Construction of NC, Inc. for McGowan Sewer Interceptor Construction Change Order #1 $470,589.95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2017 2:31:11 PM
Creation date
2/11/2015 4:11:13 PM
Metadata
Fields
Template:
BOCC
Date
6/17/2014
Meeting Type
Work Session
Document Type
Contract
Agenda Item
7F - CO
Amount
$470,589.95
Document Relationships
2014-123 Planning - Park Construction of NC Inc for McGowan Sewer Interceptor Construction $597,813
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2014
R 2014-409 Planning - Park Construction of NC, Inc. for McGowan Sewer Interceptor Construction Change Order #1
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION OF NC, INC. <br /> April 17,2014 <br /> Mr.Wesley Wightman,P.E. <br /> Construction Services Manager <br /> McGill Associates,P.A. <br /> Post Office Box 1136 <br /> Hickoiy,NC 28603 . <br /> ts-* <br /> Re: McGowan Interceptor,Orange County,NC <br /> Subject: Manhole 11 Revisions:Efland-Cedar Grove Gravity Connection <br /> Dear Wes; <br /> In accordance with Revised Plan Sheet C-102,we offer the following pricing: <br /> 0J <br /> Materials <br /> 5'Diameter Precast Manhole $3,448.88 <br /> W Inside Drop $1,456.44 <br /> 8"DIP from Exist.MH to MH 11 $ 576.06 <br /> #57 bedding stone $ 185.84 <br /> Labor&Equipment <br /> Set MH#11 $2,665.64 <br /> Install Drop $1,777.10 <br /> Testing $ 290.38 <br /> Tie-in to Exist.MH,re-work invert/plug $2,839.87 <br /> b17 Install 8"DIP Gravity Sewer $ 696.90 <br /> Subcontractor <br /> Core&Boot Exist.MH $ 530.25 <br /> Re-stake bore at Cedar Grove $ 318.15 <br /> Total $14,782.51 <br /> Please note that this additional cost will be off-set by$4,100,the original bid price for MH#11.Should you <br /> have any questions,please feel free to call. <br /> Thank you. <br /> Sincerely, <br /> Park Construction of NC,Inc, <br /> Eric E.Olsen <br /> Project Manager/Estimator <br /> cc:ICen Malonson <br /> Toby Chamberlain <br /> 32561 <br /> Post Office fox 500 ` hAarrismville,NC 27aO A FhQne(919)319-8801 41 Fax,(VI 9)019-883.5 <br /> �M E to <br />
The URL can be used to link to this page
Your browser does not support the video tag.