Orange County NC Website
CONSTRUCTION OF NC, INC. <br /> April 17,2014 <br /> Mr.Wesley Wightman,P.E. <br /> Construction Services Manager <br /> McGill Associates,P.A. <br /> Post Office Box 1136 <br /> Hickoiy,NC 28603 . <br /> ts-* <br /> Re: McGowan Interceptor,Orange County,NC <br /> Subject: Manhole 11 Revisions:Efland-Cedar Grove Gravity Connection <br /> Dear Wes; <br /> In accordance with Revised Plan Sheet C-102,we offer the following pricing: <br /> 0J <br /> Materials <br /> 5'Diameter Precast Manhole $3,448.88 <br /> W Inside Drop $1,456.44 <br /> 8"DIP from Exist.MH to MH 11 $ 576.06 <br /> #57 bedding stone $ 185.84 <br /> Labor&Equipment <br /> Set MH#11 $2,665.64 <br /> Install Drop $1,777.10 <br /> Testing $ 290.38 <br /> Tie-in to Exist.MH,re-work invert/plug $2,839.87 <br /> b17 Install 8"DIP Gravity Sewer $ 696.90 <br /> Subcontractor <br /> Core&Boot Exist.MH $ 530.25 <br /> Re-stake bore at Cedar Grove $ 318.15 <br /> Total $14,782.51 <br /> Please note that this additional cost will be off-set by$4,100,the original bid price for MH#11.Should you <br /> have any questions,please feel free to call. <br /> Thank you. <br /> Sincerely, <br /> Park Construction of NC,Inc, <br /> Eric E.Olsen <br /> Project Manager/Estimator <br /> cc:ICen Malonson <br /> Toby Chamberlain <br /> 32561 <br /> Post Office fox 500 ` hAarrismville,NC 27aO A FhQne(919)319-8801 41 Fax,(VI 9)019-883.5 <br /> �M E to <br />