Browse
Search
2015-133-E AMS - Medallion Athletic Products, Inc. for SportsPlex rubber flooring replacement Not to Exceed $95,535
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-133-E AMS - Medallion Athletic Products, Inc. for SportsPlex rubber flooring replacement Not to Exceed $95,535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 3:04:44 PM
Creation date
2/11/2015 1:49:04 PM
Metadata
Fields
Template:
Contract
Date
1/13/2015
Contract Starting Date
1/13/2015
Contract Ending Date
3/31/2015
Contract Document Type
Agreement - Construction
Amount
$95,535.00
Document Relationships
R 2015-133-E AMS - Medallion Athletic Products, Inc. for SportsPlex rubber flooring replacement
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8DBFC7C8-DFF2-4179-9582-FA3E75937570 <br /> err 1 4 10-1 6882 <br /> 1M10 <br /> A% won <br /> :_M <br /> IMP-M <br /> d"11i <br /> +nmfarr �un um�.wwrre�i. uo i mim�mammmmmaoiuumiaummms� K�arr ,mmorv��u nmnir�rv: <br /> Triangle Sportsplex <br /> Date: December 8,2014. <br /> RE; Monde Flooring <br /> Quote: 1410-16882 <br /> The following is a proposal by Medallion Athletic Products„ Inc. to supply and install. Mondo flooring at the <br /> Triangle Sportsplex in Hillsborough, NC. Upon acceptance of this proposal, Medallion will provide all <br /> materials,equipment and labor as outlined below. The scope of this proposal includes the following: <br /> Scope of iMork: <br /> • Demo of old flooring and base by others„ <br /> Grind off old glue on concrete floor. <br /> « Supply and install approximately 6,388 SF of 6rmm Mondo Sport Impact in 073 blue. We will do <br /> this in three phases. <br /> « Supply and install standard black vinyl 4"base. <br /> + Supply and install transitions. <br /> Phased work will take approximately 3,0 working days. <br /> « Supply and install alternate locker room with 6m,m Mondo Sport Impact 073 blue. <br /> Supply and Install Total .... ....... ......... ......... ......... ...$95,535.00 <br /> Per Mondo's NIPA contract#1082114-MUI <br /> • Forklift to be provided by Medallion. Required construction dumpster by ethers.. <br /> • Per Mondo Specifications, required moisture tests should have results that are below 85% relative humidity. If <br /> utilizing calcium chloride test method, results should be less than Slbs. per 1,000 SF. Detailed specifications <br /> are attached to this quote for your aid.Medallion strongly recommends getting this testing done. If you choose <br /> to not get a moisture test on the floor your acceptance of this quote attests to the fact you have been notified <br /> and still permit Medallion Athletic Products to proceed with the installation, This will release Medallion Athletic <br /> Products, Inc. and Mondo from any future moisture related issues. All non-moisture related issues of the <br /> warranty will remain in effect. <br /> • Owner to have area clear of equipment,furniture,lockers and obstructions prior to Medallion start of work. We <br /> can go to the photo machine but not under if it remains during instailation <br /> • Medallion to verify that existing concrete slab meets manufacturer specifications of flatness and proper bonding <br /> prior to start of work. If the slab is found to be outside of manufacturer recommended tolerances,owner will <br /> be responsible for additional cost to rectify slab. <br /> • Major floor leveling is not included in pricing. If over 25 Ibs of patch is used in prep work , owner will be <br /> notified and there will be a charge per lb..of$3.50 per pound of patching/leveling compound. <br /> • Medallion assumes that flooring is not to be installed over expansion joints in concrete. <br /> • Medallion does not warrant any installation that contradicts Mondo's recommendations and guidelines. <br /> • Per Mondo's recommendations the floor cannot be cleaned for 7-10 days after installation due to curing. <br /> Medallion is not responsible for the initial cleaning,but will make sure flooring is free of dust and debris. <br /> • Work to ensure existing doors and door frames operate correctly and meet ADA and egress requirements will <br /> be by others or provided at an additional cost by Medallion. <br /> • Pricing does not include union wages,prevailing wages,or certified payroll. <br /> • Lead time on all non-inventory items is 8-12 weeks. <br /> • Bonding is not included. Medallion is bondable at additional cost. Performance bonds are not part of job. <br /> • Pricing is good for 30 days. No liquidated damages in contract. Freight pricing is FOB to jobsite. <br /> • No other trades can be in our area of work while we are installing,foot traffic only after 48 hours of drying and <br /> no heavy objects on the floor until after 72 hours. <br /> • Contract includes the alternate locker room in back of rink. Demo of existing tides and base by others. <br /> Respectfully Submitted, <br /> David Greer, <br /> Regional Sales 704 363-7572 <br /> (704)363-7972 <br /> Medallion Athletic Products,Inc. * 150 River Park Road*Mooresville,NC *28117 <br /> (P) 704.660.3000 • (F) 704.660,3001. <br /> ww,wmedallionathletics.co . <br />
The URL can be used to link to this page
Your browser does not support the video tag.