Browse
Search
2015-133-E AMS - Medallion Athletic Products, Inc. for SportsPlex rubber flooring replacement Not to Exceed $95,535
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-133-E AMS - Medallion Athletic Products, Inc. for SportsPlex rubber flooring replacement Not to Exceed $95,535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 3:04:44 PM
Creation date
2/11/2015 1:49:04 PM
Metadata
Fields
Template:
Contract
Date
1/13/2015
Contract Starting Date
1/13/2015
Contract Ending Date
3/31/2015
Contract Document Type
Agreement - Construction
Amount
$95,535.00
Document Relationships
R 2015-133-E AMS - Medallion Athletic Products, Inc. for SportsPlex rubber flooring replacement
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8DBFC7C8-DFF2-4179-9582-FA3E75937570 <br /> [Departmental Use Only] <br /> TITLE Sportsplex Rubber Flooring <br /> FY 2015 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER 5,250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRIXTION AGREEMENT (hereinafter called "Agreement"), made as of the 13th <br /> day of January, 2015, by and between Medallion Athletic Products, Inc., (hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the "Owner"). <br /> w i ,r N E S, S E TH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> ,I,he Contract Documents, consist of this Agreement, the Proposal, Written Specifications, and <br /> quote 1410168R-2. The Contract Documents form the Contract. In the event of any inconsistency <br /> between or among the Contract Documents the Contract Documents shall be interpreted in the following <br /> order of priority: <br /> a. This Agreement; <br /> b. Designer Approved Bulletins and/or Field Orders; <br /> c. Written Specifications and addenda thereto; <br /> d. Proposal and quote 1410,168R2, <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Conti-actor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if`fully contained herein: <br /> a. Written specifications,prepared by the project ject engineer, <br /> b. Attached material procurement and installation proposal dated December 8, 2014, entitled <br /> Quote #1410168R2 which fully describes the work to be perfon-ned, such work <br /> (hereinafter called the "Work"). <br /> c. Related documents listed under Section I above. <br /> 3. TERM AND SCHEDULING <br /> Revised 10114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.