Browse
Search
Agenda - 03-15-1994-X-D
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 03-15-94 Regular Mtg.
>
Agenda - 03-15-1994-X-D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2015 4:17:43 PM
Creation date
2/9/2015 4:17:36 PM
Metadata
Fields
Template:
BOCC
Date
3/15/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-D
Document Relationships
Minutes - 19940315
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE ARTSCENTER, INC. <br /> ORANGE COUNTY APPLICATION 9 <br /> EXHIBIT F (DETAILED REQUEST) 11 MARCH 1994 <br /> OVERVIEW OF CAPITAL CAMPAIGN <br /> The Capital Campaign is divided into four(4) sections: Building Acquisition, <br /> Campaign Organization,ArtsCenter Operations and Long-Term Debt Elimination. It <br /> will focus on six (6) sources for generation of donations: Foundations, Major <br /> Corporations, Local Government, Other Government, Grassroots Individuals and <br /> Foundation Equity. Its financial goal includes retirement of all debt as well as building <br /> purchase and annual operations. <br /> The space being purchased encompasses a visual arts gallery, classrooms, dance studio, <br /> darkroom, ceramics studio, large theater, small theater, office space and public facilities. <br /> The building was improved in 1986 by The ArtsCenter at a cost of$700,000. The <br /> ArtsCenter owns the upfit. This proposal will cover the real property purchase. <br /> CAPITAL CAMPAIGN SECTIONS <br /> 1. Building Acquisition: includes the purchase of the real property consisting of 19,000 <br /> square feet. The acquisition will require some subdivision and survey work in order to <br /> separate the property from the existing strip mall. Architectural and survey fees are <br /> anticipated and included in the Project Budget, Attachment D. Legal fees have also <br /> been considered and are included as well. <br /> 2. Campaign Organization: The cost of running the entire campaign(excluding the <br /> April 9th Campaign Opener)is included in the$8,000 fugure(see Attachment D, <br /> Project Budget). This cost includes attorney and accounting fees as well as materials <br /> and labor for campaign production. All campaign workers are unpaid volunteers <br /> except for the current five(5) staff members. <br /> 3. ArtsCenter Operations: Because the capital campaign will be running at the same <br /> time as our normal fundraising campaign, it is prudent to run both together. <br /> $125,000 is the usual amount raised in annual fundraising and is used to support <br /> ArtsCenter operations. <br /> 4. Debt Elimination: The original $700,000 construction debt has been reduced to <br /> under$200,000. This amount is also included in the campaign. A breakdown of the <br /> actual amounts is available on request. <br /> 300-G East Main Street, Carrboro, North Carolina <br /> (919) 929-2787 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.