Orange County NC Website
and black striped warnina tape or a suitable warnina barrier, as <br />well as placing RF radiation signs as needed and appropriate to' <br />warn individuals of the potential danaer• <br />17) A signed statement that the applicant will expeditiously <br />remedy anv physical or RF interference with other <br />telecommunications or wireless devices or services caused by <br />the new installation. <br />18) The applicant shall provide a certification by a Professional <br />Engineer licensed in the State. along with documentation (a <br />structural analysis). including calculations, that prove that the <br />wireless support structure and its foundation as proposed to be <br />utilized are designed and were constructed to meet all County. <br />State, federal and ANSI structural requirements for loads} <br />including wind and ice loads and the placement of anv <br />eauiament an the roof a building after the addition of the <br />proposed new facilities. <br />191 Any application that proposes to locate a facility on County <br />owned or leased property shall contain a provision with respect <br />to indemnification. Such provision shall reauire the applicant, to <br />the extent permitted by law, to at all times defend, indemnify. <br />rotect. save. hold harmless, and exempt the Countv, and .its <br />officers boards, employees, committee members, attorneys, <br />a ents, and consultants from anv and all penalties, damages. <br />costs or charges arising out of anv and all claims. suits. <br />demands. causes of action, or award of damages, whether <br />compensatory or punitive. or expenses arising there from. either <br />at law or in eauity. which might arise out of. or are caused bv. <br />the placement. construction, erection, modification, location} <br />performance, use, operation, maintenance. repair, installation. <br />replacement. removal, or restoration of said facility. excepting, <br />however anv portion of such claims. suits. demands. causes of <br />action ~ or award of damages as may be attributable to the <br />negligent or intentional acts or omissions of the County. or its <br />consultants' fees, and expert witness fees are included in those <br />costs that the Countv can recover. Notwithstanding the <br />reauirements noted above, an indemnification provision will not <br />be reauired in those instances where the County itself applies <br />for and secures a Special Use Permit for a wireless facility. <br />design criteria: <br />1) In order to arotect the nature and character of the community <br />wherein the facility is proposed. and in order to create the <br />least visually intrusive impact reasonably possible. anv <br />