Orange County NC Website
tower. If an ANSI report has not been done pursuant to the <br />recedina schedule, an ANSI report shall be done and <br />submitted as part of the application. No Buildina Permit shall be <br />issued for anv wireless support structure where the structure <br />beina attached to is in need of remediation. unless and until the <br />County Planning and Inspections Department has approved all <br />remediation work needed has been completed or a schedule for <br />the remediation work. <br />13) A Structural Report sianed by a Professional Enaineer <br />licensed to do business in the State and bearing that engineer's <br />currently valid stamp, showing the structural adeauacy of the <br />wireless Support structure to accommodate the proposed <br />modification or antenna arrav Collocation, includina anv <br />eauipment shelter, unless the eauipment shelter is located on <br />the lowest floor of a Buildina: <br />14) If attaching to a structure other than a tower or where the <br />proposed attachment is within thirtv (30') feet of areas to which <br />the public has or could reasonably have or gain access to, <br />documentation shall be provided. includina all calculations. <br />proving that the potential exposure to RF radiation (i.e. Non-Ion <br />Emitting Radiation). will be comply with the most recent FCC <br />reaulations governing RF radiation and exposure thereto, and <br />further denoting the minimum distance from anv antennas an <br />individual may safely stand without beina exposed to RF <br />radiation in excess of the FCC's permitted standards and anv <br />portion(s) of the structure that would be exposed to RF radiation <br />in excess of the FCC's permitted standards. Compliance with <br />the FCC's reaulations. in such an instance the RF radiation from <br />all facilities at that location shall be included in the calculations <br />to show the cumulative effect on anv area of the Buildina or <br />structure deemed accessible by the public or workers. Such <br />re ort or analysis shall be sianed and sealed by a Professional <br />Enaineer licensed in the State. <br />15) If the modification or antenna arrav Collocation is thirtv (30') <br />feet or more above around level. then a sianed document such <br />as the FCC's "Checklist to Determine whether a Wireless <br />support structure may be Categorically Excluded" shall be <br />rovided to verify that the modification or antenna arrav co- <br />location will fully comply with the current FCC's ~RF emissions <br />reaulations. If not categorically excluded. a complete RF <br />emissions study is reauired to enable compliance verification. <br />includina providing all calculations so that such may be verified <br />prior to issuance of a Buildina Permit: <br />16) If anv section or portion of the structure to be attached to is <br />not in compliance with the FCC's reaulations regarding RF <br />radiation, that section or portion must be barricaded with a <br />suitable barrier to discourage approaching into the area in <br />excess of the FCC's reaulations. and be marked off with yellow <br />