Browse
Search
Agenda - 04-01-2008-c2a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 04-01-2008
>
Agenda - 04-01-2008-c2a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:34:48 PM
Creation date
8/28/2008 9:56:22 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2008
Document Type
Agenda
Agenda Item
c2a
Document Relationships
Minutes - 20080401
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />6.18.5 Master Telecommunications Plan ("Plan") <br />The Plan will assist providers in their search for suitable locations to build their <br />service network. The Caunty may develop the Plan (map), which would display <br />locations within the County's zoning jurisdiction where property owners have <br />expressed interest in allowing construction of telecommunications equipment. <br />Information that may be shown on the base Plan will include: existing towers, <br />major transmission lines, County-defined Natural Areas, historic properties, <br />scenic corridors, known bird migratory patterns through the County, Voluntary <br />Agricultural Districts, and publicly-owned or quasi-public lands. In all cases, an <br />interest in allowing the placement of telecommunication equipment on the <br />property/properties shall have been expressed. In order to participate in the MTP <br />all owner(s), or their legally binding representatives,. shall submit an application <br />on a form prepared by the Planning Department and meet the following <br />guidelines: <br />a) Information to be provided. All telecommunication providers who elect to <br />construct facilities on properties in the Plan shall provide all necessary <br />and requested information to the County's telecommunications <br />consultant. <br />b) Plan modification: After adoption of the initial Plan any. subsequent <br />modification of the Plan may be considered annually at the February <br />Quarterly Public Hearing. Any applicant requesting modification of the <br />Plan shall make application to the Zoning Officer on or before December <br />1st of each year. The fee for modifying the Plan shall be that as set forth <br />in the Orange County Plannina Fee Schedule-ef-Fees. <br />c) Withdrawal from the Plan. Withdrawal from the Plan is permitted if any <br />owner submits, to the Planning Director, a notarized statement requesting <br />withdrawal from the Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.