Orange County NC Website
12 <br />7) The actual intended transmission power stated as the <br />maximum effective radiated power (ERP), both in dBm's <br />and watts: <br />8) A statement certifying that the facility and all attachments <br />thereto comply with the conditions of the approved Special <br />Use Permit. <br />9) The legal name, address. phone number. all necessary <br />contact information of the person preparing the application• <br />10) The name, address. phone number. and all necessary <br />contact information of the property owner, if the owner of the <br />structure is different than the applicant: <br />111 The postal address. tax map block and lot number. and <br />parcel identification number of the property: <br />12) A copy of the FCC license applicable for the intended use of <br />the facility. <br />13) The Zoning District and Watershed <br />roperty is situated: The area of the <br />structure to be attached to is located <br />feet and acres and perimeter lot li <br />survey showing the location of all <br />bounds and all easements' <br />overlay in which the <br />roperty on which the <br />stated both in square <br />~e dimensions and a <br />lot lines metes and <br />14) The location, size and height of all existing and proposed <br />structures on the property on which the structure is located <br />and that is the subject of the Application: <br />6.18.2 <br />Telecommunications ors-wireless support structures and equipment as <br />principal or accessory uses <br />a) Telecommunications towers wireless support structures shall be <br />permitted as a principal or accessory use in all districts in accordance <br />with the provisions of this Ordinance as follows: <br />1) On property owned by the County or any public entity except <br />those designated as historic properties or sites. The County may, <br />in~ its sole discretion as the owner of the property, authorize the <br />application and use of County property after the applicant <br />executes a lease agreement acceptable to the County. <br />2) Telecommunications ts~rer-s wireless support structures as part of <br />existing utility poles shall be permitted as an accessory use. <br />Towers shall be constructed as part of the existing utility poles or <br />as replacements for the existing utility poles. No freestanding <br />towers constructed exclusively for personal wireless services shall <br />be permitted within utility easements. <br />3) The placement of a new telecommunications fewer wireless <br />support structures in any zoning district must be approved as a <br />Special Use, except as permitted in the Master <br />