Browse
Search
Agenda - 04-01-2008-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 04-01-2008
>
Agenda - 04-01-2008-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:35:24 PM
Creation date
8/28/2008 9:56:07 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2008
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 20080401
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />LAND USE MANAGEMENT: The Buckhorn Village Planned Development is comprised of three <br />(3) individual development districts broken down as follows: <br />• District One (1): This district is approximately forty-one (41) acres in area and intended <br />to serve no more than four (4) large retail tenants with a total anticipated combined floor <br />area of one hundred eighty-five thousand (185,000) square feet. <br />• District Two (2): This district is approximately forty (40) acres in area and intended to <br />support mixed-use development including retail, office, restaurants, indoor theaters, <br />hotels, residential, and other similar uses with an anticipated combined floor area of five <br />hundred twenty-two thousand (522,000) square feet. <br />• District Three (3): This district is approximately forty-eight (48) acres in area and is <br />intended to support large-scale retail development with the possibility of some mixed-use <br />projects. The developer has also proposed reserving an area of the District for future <br />use by a local government to address the provision of protective services (i.e. police, fire, <br />emergency, etc). The anticipated floor area within this district is approximately six <br />hundred six thousand (606,000) square feet. <br />The applicant is proposing a maximum of 1.114 million. square feet of building footprint for <br />the entire property. For more detail on the proposed land uses within the project, please refer <br />to Attachment Three (3), pages fifteen (15) through sixteen (16). <br />AGCESS MANAGEMENT: Access to the property is proposed to be as follows: <br />• Three (3) driveway entrances along Buckhorn Road, and <br />• Two (2) driveway entrances along West Ten Road <br />The applicant is also proposing to develop several bicycle lanes and pedestrian sidewalks <br />throughout the development to make it more pedestrian accessible and is proposing to have <br />four (4) bus stops with passenger pick-up and .drop-off areas. For more detail on the access <br />management plan, please refer to Attachment Three (3), pages forty-three (43) through <br />forty-six (46), Exhibit Seven (7), and Appendix D. <br />OPEN SPACE MANAGEMENT: The applicant. is proposing a comprehensive open space <br />management plan that involves preservation of existing woodlands; the planting of interior <br />parking lot buffer, and the planting of vegetation along all proposed streetscapes. For more <br />detail on the access management plan, please refer to Attachment Three (3) pages eleven <br />(11) through forty-two (42), Exhibit Five (5), and Appendix C. <br />UTILITY MANAGEMENT: The applicant is proposing to make numerous modifications to <br />existing infrastructure to support this project that is outlined within Attachment Three (3) page <br />forty-seven (47) and Exhibit Eight (8). <br />FINANCIAL IMPACT: In terms of the review of this project, there will be no financial impact on <br />the County as existing staffing levels are sufficient to process the application. With respect to <br />the overall financial impact of the project on the County please refer to Attachment Three (3) <br />Appendix B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.