~~ <br />A projected timetable for the events or steps listed above is outlined below. This timetable <br />is based on usual time for reviews and envisions that: a) the BOCC will approve the <br />Engineer's Report as submitted; and b) all review agencies will concur with a Categorical <br />Exclusion finding. If additional environmental evaluation and associated documents are <br />required to be undertaken, submitted and approved,.additional work is required; additional <br />review agencies become involved; and the project timeline lengthens by an unknown but <br />significant amount of time. _ <br />PROJECT TIME LINE PROJECTION <br />BOCC approvals initiation of process to advertise and hold a public <br />hearing on the Engineer's Report for the scope of construction for <br />the northern Buckhorn/central Efland sewer expansion project. 2/19/08 <br />BOCC holds public hearing at its first available regular meeting 4/1/08 <br />BOCC directs that scope of project outline in the Engineer's Report <br />be modified or submitted as presented 5/1/08 <br />Engineering Consultant submits unmodified Engineer's Report to NC <br />Construction Loans and Grants Section - or alternatively - 5/8/08 <br />Engineering Consultant submits modified Engineer's Report to NC <br />Construction Loans and Grants Section 5/29/08 <br />Construction Loans and Grants Section completes review of unmodified <br />Engineer's Report and forwards the report and its findings to review <br />Agencies - or alternatively - 8/8/08 <br />Construction Loans and Grants Section completes review of modified <br />Engineer's Report and forwards the report and its findings to review <br />Agencies - or alternatively - 8/29/08 <br />Review agencies complete review of unmodified Engineer's Report and <br />Forward their findings back to the Construction Loans and Grant Section <br />- or alternatively - 10/8/08 <br />Review agencies complete review of modified Engineer's Report and <br />Forward their findings back to the Construction Loans and Grant <br />Section 10/29/08 <br />Engineering Consultant submits unmodified construction plans and <br />specifications to Construction Loans and Grants Section - or <br />alternatively - 10/15/08 <br />