Browse
Search
Agenda - 04-01-2008-5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 04-01-2008
>
Agenda - 04-01-2008-5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:35:35 PM
Creation date
8/28/2008 9:56:02 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2008
Document Type
Agenda
Agenda Item
5a
Document Relationships
Minutes - 20080401
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />A projected timetable for the events or steps listed above is outlined below. This timetable <br />is based on usual time for reviews and envisions that: a) the BOCC will approve the <br />Engineer's Report as submitted; and b) all review agencies will concur with a Categorical <br />Exclusion finding. If additional environmental evaluation and associated documents are <br />required to be undertaken, submitted and approved,.additional work is required; additional <br />review agencies become involved; and the project timeline lengthens by an unknown but <br />significant amount of time. _ <br />PROJECT TIME LINE PROJECTION <br />BOCC approvals initiation of process to advertise and hold a public <br />hearing on the Engineer's Report for the scope of construction for <br />the northern Buckhorn/central Efland sewer expansion project. 2/19/08 <br />BOCC holds public hearing at its first available regular meeting 4/1/08 <br />BOCC directs that scope of project outline in the Engineer's Report <br />be modified or submitted as presented 5/1/08 <br />Engineering Consultant submits unmodified Engineer's Report to NC <br />Construction Loans and Grants Section - or alternatively - 5/8/08 <br />Engineering Consultant submits modified Engineer's Report to NC <br />Construction Loans and Grants Section 5/29/08 <br />Construction Loans and Grants Section completes review of unmodified <br />Engineer's Report and forwards the report and its findings to review <br />Agencies - or alternatively - 8/8/08 <br />Construction Loans and Grants Section completes review of modified <br />Engineer's Report and forwards the report and its findings to review <br />Agencies - or alternatively - 8/29/08 <br />Review agencies complete review of unmodified Engineer's Report and <br />Forward their findings back to the Construction Loans and Grant Section <br />- or alternatively - 10/8/08 <br />Review agencies complete review of modified Engineer's Report and <br />Forward their findings back to the Construction Loans and Grant <br />Section 10/29/08 <br />Engineering Consultant submits unmodified construction plans and <br />specifications to Construction Loans and Grants Section - or <br />alternatively - 10/15/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.