Browse
Search
Agenda - 02-28-1994 - C.1.d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 02-28-94 Public Hearing
>
Agenda - 02-28-1994 - C.1.d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2015 9:35:45 AM
Creation date
2/9/2015 9:35:40 AM
Metadata
Fields
Template:
BOCC
Date
2/28/1994
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1.d
Document Relationships
Minutes - 19940228
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
Public Hearing Notice for 02-28-1994 Mtg. - Proposed Revisions to the Zoning Ordinance
(Linked From)
Path:
\BOCC Archives\Notices - Public Hearings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> public service of to remedy a public <br /> health emergency not otherwise <br /> correctable. <br /> Such extensions shall be sized only to <br /> address the purpose for which the system <br /> is extended. <br /> c) Assurance of Installation <br /> A development project to be served by a public or <br /> private water or sewer system must be assured of <br /> installation of such service at the time it is <br /> approved. "Assured of installation" shall mean <br /> that the municipality, private association or <br /> water or sewer authority to whose system the <br /> development project is to be connected has: <br /> 1) Reviewed and approved preliminary plans for <br /> proposed water and sewer lines; and <br /> 2) Determined that the existing system has <br /> adequate capacity to serve the proposed <br /> connection(s) ; and <br /> 3) Determined that the existing water and sewer <br /> treatment facilities have adequate capacity <br /> to supply water to and treat wastewater from <br /> the proposed development, and <br /> 4) Determined that the carrying capacity of the <br /> discharge stream or discharge point is <br /> sufficient to accept the proposed discharge <br /> while maintaining water quality standards <br /> established by the North Carolina Division of <br /> Environmental Management; and <br /> 5) Determined that an adequate method of funding <br /> proposed extensions of water and sewer lines <br /> has been established; and <br /> 6) Determined that service to the development <br /> project is authorized by any water management <br /> plan and discharge permit which may be in <br /> effect at the time of approval. <br /> Indication that the above conditions for assurance <br /> of installation are satisfied, and that water <br /> and/or sewer will be provided to the development <br /> site, shall be provided by the utility provider, <br /> through approval of a formal resolution or other <br /> agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.