Browse
Search
2015-123-E Planning - Volkert, Inc. for basic services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2015
>
2015-123-E Planning - Volkert, Inc. for basic services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:49:34 PM
Creation date
2/5/2015 10:48:31 AM
Metadata
Fields
Template:
Contract
Date
2/6/2015
Contract Starting Date
2/1/2015
Contract Ending Date
4/30/2015
Contract Document Type
Agreement - Services
Amount
$35,000.00
Document Relationships
R 2015-123-E Planning - Volkert, Inc. for basic services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FC9EFE5F-2E3A-436A-9FA0-CDDB72DA1969 <br /> VOLKERT <br /> evaluated known and potential environmental constraints to the extending of an <br /> existing roadway. Issues that were evaluated included wetlands, hazardous <br /> waste, surface waters, protected species, cultural resources, and land use. <br /> PROEJCT EXPERIENCE —TRANSIT STUDIES AND DESIGN: <br /> CAT Passenger Amenity Design, Raleigh, NC (2011-2013)— Project Manager <br /> for the design of passenger amenities at multiple transit stops throughout the City <br /> of Raleigh for the Capital Area Transit system. <br /> DATA Passenger Amenity Design, Raleigh, NC (2011-2013)— Project <br /> manager for the design of passenger amenities at multiple transit stops <br /> throughout the City of Durham for the Triangle Transit Authority and Durham <br /> Area Transit Authority. <br /> TTA Bus Route Design Services, Raleigh, Durham, Apex, and Cary, NC <br /> (2005)—Project designer responsible for transit ridership surveys, GIS mapping <br /> survey results, GIS mapping route changes, and conducting public involvement <br /> programs to assess local needs for transportation and discuss transit <br /> alternatives. <br /> PROJECT EXPERIENCE —ROADWAY DESIGN: <br /> Westgate Road, Raleigh, NC (2013-2014)— Project manager responsible for the <br /> development of 100% design plans, construction specification, contract <br /> documents, and engineers estimate of probable cost for the realignment of <br /> Westgate Road in Raleigh, NC. This facility is planned to be 2-lane facility on 65 <br /> foot of right-of-way and is being relocated to allow additional room for the <br /> expansion of the Martin Marietta quarry just to the south of the facility. This facility <br /> also includes one structure to allow for the crossing of mining vehicles underneath <br /> Westgate Road as well as signal modification designs for two traffic signals along <br /> Westgate Road. <br /> Lewisville Roundabout, Lewisville, NC (2012-2013) — Project manager <br /> responsible for the development of 100% design plans, construction specification, <br /> contract documents, and engineers estimate of probable cost for a new 2-lane <br /> roundabout at the intersection of Shallowford Road and Williams Road in <br /> Lewisville, NC. <br /> I <br /> Letchworth,William E. Page 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.