Orange County NC Website
P19F <br /> WA J�1715 <br /> [Departmental Use Only] <br /> TITLE Cedar Grove Roof Replacement <br /> FY 2015 <br /> NORTH CAROLINA <br /> ORANGE COUNTY CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 1 st day of <br /> December, 2014, by and between Muter Construction LLC, (hereinafter called the "Contractor"), and Orange <br /> County, a body politic and a political subdivision of the State of North Carolina, (hereinafter called the <br /> "County,""Orange County,"or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner,for the consideration herein named,agree as follows: <br /> 1. CONTRACT DOCUMENTS;PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by 5`h Wall Building Diagnostics Consultants (Sheet 1.01 <br /> through 1.05 dated September,2014) <br /> b. Written specifications prepared by the Designer. <br /> c. Bid number 367-296 proposal dated November 13,2014 which fully describes the work to be <br /> performed,such work(hereinafter called the"Work"). <br /> Revised 10/14 1 <br />