Browse
Search
Agenda - 04-01-2008-3a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 04-01-2008
>
Agenda - 04-01-2008-3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:40:25 PM
Creation date
8/28/2008 9:55:02 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2008
Document Type
Agenda
Agenda Item
3a
Document Relationships
Minutes - 20080401
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-024 Turkey Farm Road Bridge Resolution
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />NCDOT has specified "Design Standards in Sensitive Watersheds", design standards giving <br />the highest level of erosion control measures NCDOT implements, to be used for this <br />project. <br />2. NCDOT sends Start of Study letters to federal, state and local officials requesting input <br />concerning projects. The letters are sent to the County Managers, who can enlist advisory <br />committee comments to forward to NCDOT. <br />3. For federal aid projects, such. as bridge replacements, the Federal Highway Administration <br />(FHWA) determines which type of Environmental Analysis (EA) is needed. The County may <br />request that the FHWA approve an environmental assessment process required for projects <br />that may impact species identified on the National Endangered Species list. If the FHWA <br />agrees to fund another EA, the study will, of course, delay the project in a similar fashion to <br />.redesigning the bridge so that the superstructure is above the 100-year flood elevation. <br />FINANCIAL IMPACT: NCDOT has not ruled out the requests for further environmental <br />analysis and bridge redesign, but would have to cover the costs by cutting some other project <br />unless the local jurisdiction(s) wish to provide matching funds to cover the increased casts. <br />RECOMMENDATION(S): The Manager recommends that the Board consider approving the <br />attached resolution from the New Hope Creek Corridor Advisory Committee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.