Browse
Search
Agenda - 04-01-2008-3a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2008
>
Agenda - 04-01-2008
>
Agenda - 04-01-2008-3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 4:40:25 PM
Creation date
8/28/2008 9:55:02 AM
Metadata
Fields
Template:
BOCC
Date
4/1/2008
Document Type
Agenda
Agenda Item
3a
Document Relationships
Minutes - 20080401
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2008
RES-2008-024 Turkey Farm Road Bridge Resolution
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: April 1, 2008 <br />Action Agenda <br />Item No. .~ ' q <br />SUBJECT: Turkey Farm Road Bridge Resolution <br />DEPARTMENT: Planning and Inspections PUBLIC HEARING: (YIN) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Turkey Farm Road Bridge Resolution . Karen Lincoln, 245-2594 <br />New Hope Advisory Committee Letter Craig Benedict, 245-2592 <br />Letter from BOCC Chair to NCDOT <br />Bridge Structural Elements Diagram <br />Current Picture of Turkey Farm Road Bridge <br />PURPOSE: To consider approving a resolution concerning the Turkey Farm Road bridge <br />replacement. <br />BACKGROUND: The North Carolina Department of Transportation (NCDOT) plans to <br />construct TIP Project B-4218 (replace Orange County Bridge No. 108 on SR 1730, Turkey Farm <br />Road, over New Hope Creek) this year as scheduled in the 2007-2013 Transportation <br />Improvement Program (TIP). Bridge No. 108 has a sufficiency rating of 24.2 out of a possible <br />100 (for a new structure) and is considered structurally deficient and functionally obsolete. The <br />current structure is not safe for use by school buses or fire trucks. (For example, the current <br />structure, built in 1953, has a weight limit of 7 tons and a fire truck weighs about 20 tons.) <br />This area of New Hope Creek supports a unique community of fresh water mussels including <br />three State Endangered Species, two Federal Species of Concern, and several other <br />significantly rare species and species of special concern. <br />New Hope Creek Corridor Advisory Committee (NHCCAC) Resolution: <br />The NHCCAC has stated its concerns and desired actions regarding the bridge replacement in <br />the attached resolution, which the NHCCAC requests that the Board of County Commissioners <br />(BOCC) endorse. <br />The resolution requests that the NCDOT: <br />1. Ensure maintenance of high water quality, pristine habitat for aquatic species, passage for <br />terrestrial wildlife and adequate recreational access (raising the bridge height sufficiently to <br />accommodate an under bridge pedestrian trail) in the design and construction of the bridge. <br />2. Consult with the Advisory Committee in any decisions that may impact the New Hope Creek <br />natural corridor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.