Browse
Search
Agenda - 02-15-1994-X-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 02-15-94 Regular Mtg.
>
Agenda - 02-15-1994-X-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2015 12:10:25 PM
Creation date
1/28/2015 12:09:58 PM
Metadata
Fields
Template:
BOCC
Date
2/15/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
X-A
Document Relationships
Minutes - 19940215
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Since receiving approval from the Board of County Commissioners, the <br /> Staff has performed the following: <br /> - Performed site suitability analysis - Orange County Engineer, Orange <br /> County Planner, Orange County Soil Scientist and Orange County <br /> Public Works Director visited site and determined that site is <br /> suitable for a Solid Waste Convenience Center. <br /> - Land Surveyor conducted survey including topographic elevation. <br /> - County Engineer began development of a conceptual site plan. <br /> - Purchasing Agent began developing proposed lease. <br /> The next step in the process which will require expenditure of funds <br /> will include: <br /> - Development approval and execution of an acceptable lease agreement. <br /> - Development of site plan. <br /> - Seek approval of the subdivision through the Orange County Planning <br /> Department process. <br /> - Develop and seek approval for an erosion control plan for <br /> development of the site through the State. <br /> - Development of construction documents. <br /> - Follow purchasing procedure for securing necessary bid proposals <br /> and contracts for construction of the Solid Waste Convenience <br /> Centers. <br /> - Construction of the site and placement of equipment. <br /> RECOMMENDATION: The Manager recommends that the Board provide <br /> direction to the Staff on development of the proposed Saddle Club <br /> Road Solid Waste Convenience Center. <br />
The URL can be used to link to this page
Your browser does not support the video tag.