Orange County NC Website
57 <br /> Page 6 <br /> RE: Docket No. W-848, Sub 15 & 16 <br /> Capital Improvements Requiring Assessment <br /> Piney Mountain Subdivision <br /> 12) Locate and adjust to elevation acceptable to local authority all <br /> "turn-up" pipes at ends of laterals in Phase II drainfield and provide <br /> Physical protection for these "turn-ups". <br /> 517 "turn-ups" @ 9.50 ea. <br /> Materials 2585.00 <br /> Equipment & Labor 2326.50 <br /> rM 012 TOTAL: $ 4911.50 <br /> 13) Provide and install such additional soil material as may be <br /> necessary to smooth surface countour of Phase II field areas so that <br /> surface water pondinq and trench settling are eliminated. Seeding and <br /> mulching of all disturbed areas. <br /> Furnish & Install Topsoil Fill 600 CY @ 22.50 13500.00 <br /> Seeding & Mulching 3.92 AC @ 1650.00 6468.00 <br /> Imo! 013 202RL: $ 19968.00 <br /> The above figures totalling $179031.89 represent the estimated outside oast <br /> to be incurred by HUC in making the listed repairs and improvemnnts. In addition, <br /> HUC anticipates an cost of ap WoX mately $9705.00 to include submittal <br /> of plans and specifications necessary to aaquire the ree;WxW repair permit from <br /> the Wake County Department of Health. <br /> A fee of ten percent of the total cost for than repairs will be needed by <br /> HUC in order to cover overhead menses incurred by HUC in supervising and <br /> coordinating these repairs and impcov nts. <br /> A reconciliation of the total cost is as follows: <br /> Cost for Items 01 thru $13: $179031.89 <br /> Engineering Few: 9705.00 <br /> HUC Supervision & Caooa dilation: 18873.68 <br /> TOM: $207610.S7 <br />