Browse
Search
Agenda - 01-18-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-18-94 Regular Mtg.
>
Agenda - 01-18-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 11:06:37 AM
Creation date
1/27/2015 11:05:29 AM
Metadata
Fields
Template:
BOCC
Date
1/18/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
57 <br /> Page 6 <br /> RE: Docket No. W-848, Sub 15 & 16 <br /> Capital Improvements Requiring Assessment <br /> Piney Mountain Subdivision <br /> 12) Locate and adjust to elevation acceptable to local authority all <br /> "turn-up" pipes at ends of laterals in Phase II drainfield and provide <br /> Physical protection for these "turn-ups". <br /> 517 "turn-ups" @ 9.50 ea. <br /> Materials 2585.00 <br /> Equipment & Labor 2326.50 <br /> rM 012 TOTAL: $ 4911.50 <br /> 13) Provide and install such additional soil material as may be <br /> necessary to smooth surface countour of Phase II field areas so that <br /> surface water pondinq and trench settling are eliminated. Seeding and <br /> mulching of all disturbed areas. <br /> Furnish & Install Topsoil Fill 600 CY @ 22.50 13500.00 <br /> Seeding & Mulching 3.92 AC @ 1650.00 6468.00 <br /> Imo! 013 202RL: $ 19968.00 <br /> The above figures totalling $179031.89 represent the estimated outside oast <br /> to be incurred by HUC in making the listed repairs and improvemnnts. In addition, <br /> HUC anticipates an cost of ap WoX mately $9705.00 to include submittal <br /> of plans and specifications necessary to aaquire the ree;WxW repair permit from <br /> the Wake County Department of Health. <br /> A fee of ten percent of the total cost for than repairs will be needed by <br /> HUC in order to cover overhead menses incurred by HUC in supervising and <br /> coordinating these repairs and impcov nts. <br /> A reconciliation of the total cost is as follows: <br /> Cost for Items 01 thru $13: $179031.89 <br /> Engineering Few: 9705.00 <br /> HUC Supervision & Caooa dilation: 18873.68 <br /> TOM: $207610.S7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.