Browse
Search
Agenda - 01-18-1994-IX-A
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1994
>
Agenda - 01-18-94 Regular Mtg.
>
Agenda - 01-18-1994-IX-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2015 11:06:37 AM
Creation date
1/27/2015 11:05:29 AM
Metadata
Fields
Template:
BOCC
Date
1/18/1994
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
IX-A
Document Relationships
Minutes - 19940118
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
56 <br /> w <br /> Page 5 <br /> RE: Docket No. W-848, Sub 15 & 16 <br /> Capital Improvements Requiring Assessment <br /> Piney rlomtain S ibdivisicn <br /> 10) Replace existing pumps in Phase II dosing tank and pipe new pumps to allow <br /> for proper maintenance access, provide appropriate isolation valves for <br /> each pump, provide proper disconnect for pumps and floats adjacent to <br /> dosing tank, replace float switches, install non-corrosive float bracket, <br /> replace existing controls with new UL rated duplex control panel having <br /> suitable control logic to provide for reliable automatic and manual <br /> operation of control valves and valve-specific annunciation of improper <br /> operation of any given valve. New control panel will include event and <br /> time accumulators for each control zone. Replace inoperable telephone <br /> dialer. <br /> Materials 43372.00 <br /> Equipment & Labor 2336.00 <br /> Electrical 3630.00 <br /> IMN #10 TOTRL: $49338.00 <br /> 11) Replace all existing irrigation type solenoid valves at Phase II drainfield <br /> with suitable w'COntBmLinanit resistant" (effluent rated) valves, including <br /> the provision of irrdepe t ball valve for isolation and gate valve for <br /> flow control and flow sensing device. Valve assemble shall be installed <br /> in suitable enclosures such that normal foot traffic and mowing equipment <br /> may pass over them without injury to either enclosure or equipment, while <br /> providing sufficient roam to repair and adjust the valves. <br /> 51 valve assemblies 0 530.00 ea. <br /> Materials 13260.00 <br /> Equipment & Labor 13770.00 <br /> T= #II S0=0. $ 27030.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.